Installation [10/2020 - 11/2021]: Procedure
- INSTALL HEADUP DISPLAY
-
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
Bolt Connector w/o Advanced Drive:
- Connect the connector and temporarily install the headup display.
- Install the headup display with the 3 bolts in the order shown in the illustration.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
-
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
Bolt Connector w/ Advanced Drive:
- Connect the 2 connectors and temporarily install the headup display.
- Install the headup display with the 3 bolts in the order shown in the illustration.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
-
- INSTALL INSTRUMENT PANEL SAFETY PAD SUB-ASSEMBLY
Refer to INSTALLATION [10/2020 - 11/2021]
- CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL
Refer to PROCEDURE - Step 2
- INSTALL LUGGAGE COMPARTMENT MAT SUB-ASSEMBLY
Refer to PROCEDURE - Step 13
- INITIALIZATION AFTER RECONNECTING AUXILIARY BATTERY TERMINAL
Refer to WORK PROCEDURE [10/2020 - 11/2021]
HINT:
When disconnecting and reconnecting the auxiliary battery, there is an automatic learning function that completes learning when the respective system is used.
- PERFORM DIAGNOSTIC SYSTEM CHECK
- w/ Advanced Park:
-
- w/o Advanced Park:
- w/ Advanced Park:
- CHECK SRS WARNING LIGHT
- w/ Advanced Park:
-
- w/o Advanced Park:
Refer to OPERATION CHECK [10/2020 - 11/2021]
- w/ Advanced Park: