Installation [12/2017 - 10/2020]: Procedure
- INSTALL STARTER ASSEMBLY
- INSTALL STARTER COVER
- INSTALL FLYWHEEL HOUSING SIDE STAY
- Install the flywheel housing side stay with the 2 bolts.
Torque: 21 N.m (214 kgf/cm, 15 ft.lbf)
- Install the flywheel housing side stay with the 2 bolts.
- CONNECT NO. 2 ENGINE WIRE
- Install the 2 bolts and connect the No. 2 engine wire.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- Install the 2 bolts and connect the No. 2 engine wire.
- INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET RH (for AWD)
Refer to PROCEDURE - Step 26 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 26 [09/2018 - 10/2020]
- INSTALL FRONT ENGINE MOUNTING INSULATOR (for AWD)
Refer to PROCEDURE - Step 27 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 27 [09/2018 - 10/2020]
- CONNECT FRONT FRAME ASSEMBLY (for AWD)
Refer to PROCEDURE - Step 28 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 28 [09/2018 - 10/2020]
- INSTALL CONVERTER ASSEMBLY RH
Refer to PROCEDURE - Step 2
- INSTALL ENGINE ASSEMBLY WITH TRANSMISSION
Refer to INSTALLATION [12/2017 - 09/2018] , or refer to INSTALLATION [09/2018 - 10/2020]
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [12/2017 - 09/2018] , or refer to INITIALIZATION [09/2018 - 10/2020]
- INSTALL LUGGAGE COMPARTMENT FLOOR MAT
Refer to PROCEDURE - Step 12
- INSTALL LUGGAGE COMPARTMENT MAT SUB-ASSEMBLY
Refer to PROCEDURE - Step 11