LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2020 >> LS 500 Base, RWD >> Repair and Diagnosis >> Engine Mechanical >> Starter >> Engine Starting System - Service Information >> Starter >> Installation [12/2017 - 10/2020] >> Procedure

Installation [12/2017 - 10/2020]: Procedure

  1. INSTALL STARTER ASSEMBLY 
    1. Install the starter assembly with the 2 bolts.

      Torque: 46 N.m (469 kgf/cm, 34 ft.lbf) 

      GTY811168Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      Connector
      Bolt
    2. Connect the connector and attach the clamp.
    3. Install the No. 2 engine wire with the nut to the terminal B.

      Torque: 9.8 N.m (100 kgf/cm, 87 in.lbf) 

      GTY795499Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    4. Attach the claw to close the terminal cover.
      GTY831728Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    5. for 2WD:
      1. Install the bolt to connect the oil cooler tube.
        GTY795511Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

        Torque: 22 N.m (224 kgf/cm, 16 ft.lbf) 

  2. INSTALL STARTER COVER 
    1. Install the starter cover with the bolt and nut.

      Torque: 11.5 N.m (117 kgf/cm, 8 ft.lbf) 

      GTY834097Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      Bolt
      Nut
  3. INSTALL FLYWHEEL HOUSING SIDE STAY 
    1. Install the flywheel housing side stay with the 2 bolts.

      Torque: 21 N.m (214 kgf/cm, 15 ft.lbf) 

  4. CONNECT NO. 2 ENGINE WIRE 
    1. Install the 2 bolts and connect the No. 2 engine wire.

      Torque: 10 N.m (102 kgf/cm, 7 ft.lbf) 

  5. INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET RH (for AWD) 

    Refer to PROCEDURE - Step 26 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 26 [09/2018 - 10/2020]

  6. INSTALL FRONT ENGINE MOUNTING INSULATOR (for AWD) 

    Refer to PROCEDURE - Step 27 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 27 [09/2018 - 10/2020]

  7. CONNECT FRONT FRAME ASSEMBLY (for AWD) 

    Refer to PROCEDURE - Step 28 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 28 [09/2018 - 10/2020]

  8. INSTALL CONVERTER ASSEMBLY RH 

    Refer to PROCEDURE - Step 2

  9. INSTALL ENGINE ASSEMBLY WITH TRANSMISSION 

    Refer to INSTALLATION [12/2017 - 09/2018] , or refer to INSTALLATION [09/2018 - 10/2020]

  10. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
    NOTE:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Refer to INITIALIZATION [12/2017 - 09/2018] , or refer to INITIALIZATION [09/2018 - 10/2020]

  11. INSTALL LUGGAGE COMPARTMENT FLOOR MAT 

    Refer to PROCEDURE - Step 12

  12. INSTALL LUGGAGE COMPARTMENT MAT SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 11