Installation [05/2023 - ]: Procedure
- INSTALL STOP LIGHT SWITCH MOUNTING ADJUSTER
- INSTALL STOP LIGHT SWITCH ASSEMBLY
- Insert the stop light switch assembly to the stop light switch mounting adjuster until the switch body slightly touches the brake pedal.NOTE:
Do not depress the brake pedal.
- Rotate the stop light switch assembly clockwise by approximately one fourth of a rotation.
*a Protrusion Amount Measurement Area - Check the protrusion amount of the shaft.
Standard
1.5 to 2.6 mm (0.0591 to 0.1024 in.)
- Connect the connector.
- Insert the stop light switch assembly to the stop light switch mounting adjuster until the switch body slightly touches the brake pedal.
- INSTALL DRIVER SIDE JUNCTION BLOCK ASSEMBLY WITH MAIN BODY ECU
Refer to INSTALLATION [05/2023 - ]
- INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 35
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Refer to PROCEDURE - Step 2
- INSTALL NO. 2 DECK BOARD
Refer to PROCEDURE - Step 13
- PERFORM DIAGNOSTIC SYSTEM CHECK
Refer to DTC CHECK / CLEAR [04/2020 - ]
- CHECK SRS WARNING LIGHT
Refer to OPERATION CHECK [04/2020 - ]
- INITIALIZATION AFTER RECONNECTING BATTERY TERMINAL
HINT:
When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.