LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2020 >> IS 350 Base, RWD >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Meter / Gauge / Display - Service Information >> Combination Meter >> Installation [10/2016 - 09/2020] >> Procedure

Installation [10/2016 - 09/2020]: Procedure

  1. INSTALL COMBINATION METER ASSEMBLY 
    1. Connect each connector.
    2. Engage the clamp.
    3. Install the combination meter assembly with the 4 screws.
  2. INSTALL METER HOOD SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 32 [10/2016 - 10/2017] , or refer to PROCEDURE - Step 32 [10/2017 - 09/2020]

  3. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 35 [10/2016 - 10/2017] , or refer to PROCEDURE - Step 35 [10/2017 - 09/2020]

  4. CONNECT HOOD LOCK CONTROL LEVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 36 [10/2016 - 10/2017] , or refer to PROCEDURE - Step 36 [10/2017 - 09/2020]

  5. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 37 [10/2016 - 10/2017] , or refer to PROCEDURE - Step 37 [10/2017 - 09/2020]

  6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
    NOTE:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Refer to INITIALIZATION [10/2016 - 10/2017] , or refer to INITIALIZATION [10/2017 - 09/2020]

  7. CUSTOMIZE POWER TILT AND POWER TELESCOPIC STEERING COLUMN SYSTEM (for Power Tilt and Power Telescopic Steering Column) 

    Refer to PROCEDURE - Step 16 [10/2016 - 10/2017] , or refer to PROCEDURE - Step 16 [10/2017 - 09/2020]