Installation [08/2015 - ]: Procedure
- INSTALL VANE PUMP ASSEMBLY
- Install the vane pump with the 2 bolts.
Torque: 43 N*m (438 kgf*cm, 32 ft.*lbf)
- Install the vane pump with the 2 bolts.
- CONNECT PRESSURE FEED TUBE
- Install a new gasket to the pressure feed tube.
- Connect the pressure feed tube and install the union bolt.
Torque: 50 N*m (510 kgf*cm, 37 ft.*lbf)
HINT:
Make sure the stopper of the pressure feed tube touches the vane pump.
- CONNECT POWER STEERING OIL PRESSURE SWITCH CONNECTOR
- Connect the connector.
- CONNECT NO. 1 OIL RESERVOIR TO PUMP HOSE
- Connect the No. 1 oil reservoir to pump hose to the vane pump assembly with the clip.
- INSTALL FAN AND GENERATOR V BELT
Refer to PROCEDURE - Step 1
- INSTALL RADIATOR SUPPORT UPPER SEAL
Refer to PROCEDURE - Step 81 [08/2015 - 08/2020] , or refer to PROCEDURE - Step 81 [08/2020 - ]
- INSTALL AIR CLEANER CASE
Refer to PROCEDURE - Step 51 [08/2015 - 08/2020] , or refer to PROCEDURE - Step 51 [08/2020 - ]
- INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY
- INSTALL AIR CLEANER CAP AND HOSE
Refer to PROCEDURE - Step 53 [08/2015 - 08/2020] , or refer to PROCEDURE - Step 53 [08/2020 - ]
- INSTALL V-BANK COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 80 [08/2015 - 08/2020] , or refer to PROCEDURE - Step 80 [08/2020 - ]
- INSTALL FRONT FENDER APRON SEAL RH
Refer to PROCEDURE - Step 84 [08/2015 - 08/2020] , or refer to PROCEDURE - Step 84 [08/2020 - ]
- INSTALL FRONT WHEEL RH
Torque: 103 N*m (1050 kgf*cm, 76 ft.*lbf)
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Refer to INITIALIZATION [08/2015 - 08/2019] , or refer to INITIALIZATION [08/2019 - 08/2021] , or refer to INITIALIZATION [08/2021 - 08/2022] , or refer to INITIALIZATION [08/2022 - ] ).
- ADD POWER STEERING FLUID
- BLEED POWER STEERING FLUID
See step 2
- INSPECT FOR POWER STEERING FLUID LEAK