Removal [10/2019 - 08/2021]: Procedure
WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 2024 Lexus ES 350, 2023 Lexus ES 350, 2022 Lexus ES 350, 2021 Lexus ES 350, and 2020 Lexus ES 350. However, it is still accessible from the selected car via links, so may be relevant.
- REMOVE ENGINE ASSEMBLY WITH TRANSAXLE
Refer to REMOVAL [10/2019 - 08/2021]
- REMOVE CAMSHAFT TIMING OIL CONTROL SOLENOID ASSEMBLY (for Intake Side of Bank 2)
See step 7
- SET NO. 1 CYLINDER TO TDC/COMPRESSION
- Turn the crankshaft pulley clockwise until its timing mark (cutout) is aligned with the timing mark on the timing chain cover assembly as shown in the illustration.
*a Timing Mark *b Timing Mark (Cutout) - Check that the cutout of the camshaft timing gear assembly is at the top.
*a Correct *b Incorrect *c Cutout *d Up HINT:
If the cutout of the camshaft timing gear assembly is not at the top, turn the crankshaft 360° clockwise and align the timing mark (cutout) of the crankshaft pulley with the timing mark on the timing chain cover assembly again.
- Turn the crankshaft pulley clockwise until its timing mark (cutout) is aligned with the timing mark on the timing chain cover assembly as shown in the illustration.
- REMOVE CAMSHAFT TIMING GEAR BOLT