Reassembly [06/2018 - ]: Procedure
WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 2024 Lexus ES 350, 2023 Lexus ES 350, 2022 Lexus ES 350, 2021 Lexus ES 350, and 2020 Lexus ES 350. However, it is still accessible from the selected car via links, so may be relevant.
- INSTALL RING PIN
- INSTALL FRONT OIL PUMP BODY
- INSTALL FRONT OIL PUMP DRIVEN GEAR
- INSTALL FRONT OIL PUMP DRIVE GEAR
- Coat the front oil pump drive gear with Toyota Genuine ATF WS and install it to the front oil pump body.
- INSTALL STATOR SHAFT ASSEMBLY
- INSTALL OIL STRAINER ASSEMBLY
- INSTALL CLUTCH DRUM OIL SEAL RING
- Apply a small amount of MP grease to the entire circumference of the clutch drum oil seal ring installation groove portion.
HINT:
By applying MP grease, the wobble within the clutch drum oil seal ring installation groove will be eliminated, preventing damage to the clutch drum oil seal ring at the time of front oil pump assembly installation.
- Coat 4 new clutch drum oil seal rings with Toyota Genuine ATF WS and install them to the front oil pump assembly.NOTE:
While making the spread of the opening of the clutch drum oil seal ring as small as possible, install it to the front oil pump assembly.
If the ring opening is spread, briefly hold it closed with your fingers to return it to its original condition.
- Apply a small amount of MP grease to the entire circumference of the clutch drum oil seal ring installation groove portion.