LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2020 >> ES 300h Luxury >> Repair and Diagnosis >> External Pages >> Different car >> Section 129 (Fuel System (2GR-FKS) - Service Information) >> FUEL PUMP (for High Pressure) >> On-Vehicle Inspection [06/2018 - ] >> Procedure

On-Vehicle Inspection [06/2018 - ]: Procedure

WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 2024 Lexus ES 350, 2023 Lexus ES 350, 2022 Lexus ES 350, 2021 Lexus ES 350, and 2020 Lexus ES 350. However, it is still accessible from the selected car via links, so may be relevant.
  1. FUEL PUMP ASSEMBLY OPERATION 
    1. Check fuel pressure.
      1. Connect the Techstream to the DLC3.
      2. Start the engine.
      3. Turn the Techstream on.
      4. Enter the following menus: Powertrain / Engine / Active Test / Control the Target Fuel Pressure Offset.

        Powertrain > Engine > Active Test 

        Active Test Display
        Control the Target Fuel Pressure Offset
        Data List Display
        Fuel Pressure (High)
      5. Select the Data List item: Fuel Pressure (High)
      6. Check that the fuel pressure fluctuates when the target fuel pressure changes.

        HINT: 

        The target fuel pressure operation decreases the target fuel pressure by 12.5% or increases the target fuel pressure by 24.8%.

        If the result is not as specified, replace the fuel pump assembly or fuel pressure sensor (fuel delivery pipe with sensor assembly LH).

    2. Check operating sound.
      1. Remove the V-bank cover sub-assembly.

        Refer to PROCEDURE - Step 19 [06/2018 - 10/2019] , or refer to PROCEDURE - Step 19 [10/2019 - 08/2021] , or refer to PROCEDURE - Step 19 [08/2021 - 09/2022] , or refer to PROCEDURE - Step 19 [09/2022 - ]

      2. Start the engine.
      3. Using a sound scope, check the operating sound of the fuel pump assembly.

        If no sound can be heard, check the fuel pump assembly, wire harness and ECM.

      4. Stop the engine.
      5. Install the V-bank cover sub-assembly.

        Refer to PROCEDURE - Step 47