Power Source Circuit [09/2014 - 03/2019]: Procedure
- CHECK HARNESS AND CONNECTOR (HEADLIGHT LIGHT CONTROL ECU SUB-ASSEMBLY - BATTERY AND BODY GROUND)
- Disconnect the A3 headlight light control ECU sub-assembly LH connector.
- Disconnect the A11 headlight light control ECU sub-assembly RH connector.
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
HEADLIGHT LIGHT CONTROL ECU SUB-ASSEMBLY LH SIDETester Connection Condition Specified Condition A3-13 (ECUB) - Body ground Light control switch in tail or head position 11 to 14 V A3-4 (IG) - Body ground Engine switch on (IG) 11 to 14 V HEADLIGHT LIGHT CONTROL ECU SUB-ASSEMBLY RH SIDETester Connection Condition Specified Condition A11-13 (ECUB) - Body ground Light control switch in tail or head position 11 to 14 V A11-4 (IG) - Body ground Engine switch on (IG) 11 to 14 V - Measure the resistance according to the value(s) in the table below.
Standard Resistance
HEADLIGHT LIGHT CONTROL ECU SUB-ASSEMBLY LH SIDETester Connection Condition Specified Condition A3-12 (GND) - Body ground Always Below 1 Ω HEADLIGHT LIGHT CONTROL ECU SUB-ASSEMBLY RH SIDETester Connection Condition Specified Condition A11-12 (GND) - Body ground Always Below 1 Ω Result
Result Proceed to OK A NG (Headlight Light Control ECU Sub-assembly LH Side) B NG (Headlight Light Control ECU Sub-assembly RH Side) C
Result:
A
PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE. Refer to PROBLEM SYMPTOMS TABLE [09/2014 - 03/2019]
Result:
C
See step 7
Result:
B
See step 2
- INSPECT H-LP LH RELAY
- Remove the H-LP LH relay from the No. 1 engine room relay block and No. 1 junction block assembly.
- Inspect the H-LP LH relay.
Refer to ON-VEHICLE INSPECTION [09/2014 - 03/2019]
Result
Proceed to OK NG
Result:
NG
REPLACE H-LP LH RELAY
Result:
OK
See step 3
- CHECK HARNESS AND CONNECTOR (H-LP LH RELAY - BATTERY)
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Condition Specified Condition Relay terminal 1 - Body ground Always 11 to 14 V Relay terminal 3 - Body ground Always 11 to 14 V Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 4
- Measure the voltage according to the value(s) in the table below.
- CHECK HARNESS AND CONNECTOR (H-LP LH RELAY - HEADLIGHT LIGHT CONTROL ECU SUB-ASSEMBLY LH)
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition Relay terminal 5 - A3-13 (ECUB) Always Below 1 Ω Relay terminal 5 - Body ground Always 10 kΩ or higher Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 5
- Measure the resistance according to the value(s) in the table below.
- CHECK HARNESS AND CONNECTOR (H-LP LH RELAY - INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY)
- Disconnect the 4C instrument panel junction block assembly connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition Relay terminal 2 - 4C-29 Always Below 1 Ω Relay terminal 2 - Body ground Always 10 kΩ or higher Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 6
- INSPECT INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
- Remove the instrument panel junction block assembly.
Refer to REMOVAL [09/2014 - ]
- Remove the main body ECU (multiplex network body ECU) from the instrument panel junction block assembly.
- Measure the resistance according to the value(s) in the table below.
*a Component without harness connected
(Instrument Panel Junction Block Assembly)- - Standard Resistance
Tester Connection Condition Specified Condition 4C-29 - MB-15 (HRLY) Always Below 1 Ω Result
Proceed to OK NG
Result:
OK
REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU). Refer to REMOVAL [09/2014 - ]
Result:
NG
REPLACE INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY. Refer to REMOVAL [09/2014 - ]
- Remove the instrument panel junction block assembly.
- INSPECT H-LP RH/MIR HTR RELAY
- Remove the H-LP RH/MIR HTR relay from the No. 1 engine room relay block and No. 1 junction block assembly.
- Inspect the H-LP RH/MIR HTR relay.
Refer to ON-VEHICLE INSPECTION [09/2014 - 03/2019]
Result
Proceed to OK NG
Result:
NG
REPLACE H-LP RH/MIR HTR RELAY
Result:
OK
See step 8
- CHECK HARNESS AND CONNECTOR (H-LP RH/MIR HTR RELAY - BATTERY)
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Condition Specified Condition Relay terminal 1 - Body ground Always 11 to 14 V Relay terminal 3 - Body ground Always 11 to 14 V Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 9
- Measure the voltage according to the value(s) in the table below.
- CHECK HARNESS AND CONNECTOR (H-LP RH/MIR HTR RELAY - HEADLIGHT LIGHT CONTROL ECU SUB-ASSEMBLY RH)
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition Relay terminal 5 - A11-13 (ECUB) Always Below 1 Ω Relay terminal 5 - Body ground Always 10 kΩ or higher Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 10
- Measure the resistance according to the value(s) in the table below.
- CHECK HARNESS AND CONNECTOR (H-LP RH/MIR HTR RELAY - MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU))
- Disconnect the O2 main body ECU (multiplex network body ECU) connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition Relay terminal 2 - O2-1 (DIM) Always Below 1 Ω Relay terminal 2 - Body ground Always 10 kΩ or higher Result
Proceed to OK NG
Result:
OK
REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU). Refer to REMOVAL [09/2014 - ]
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR