LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2019 >> NX 300h >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Meter / Gauge / Display System (Service Information) >> Clock >> Inspection [10/2014 - 09/2017] >> Procedure

Inspection [10/2014 - 09/2017]: Procedure

  1. INSPECT AIR CONDITIONING CONTROL ASSEMBLY (CLOCK) 
    1. Check the illumination.

      Apply auxiliary battery voltage to the connector and check the illumination condition.

      OK

      Measurement Condition Specified Condition
      Auxiliary battery positive (+) → Terminal 16 (ILL+)
      Auxiliary battery negative (-) → Terminal 15 (ILL-)
      Illuminates

      If the result is not as specified, replace the air conditioning control assembly (clock).

      GTY498126Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Component without harness connected
      (Air Conditioning Control Assembly (Clock))
  2. INSPECT HEATER CONTROL CABLE SUB-ASSEMBLY 
    1. Inspect the heater control cable sub-assembly.
      1. Measure the resistance and check the results in accordance with the value(s) in the tables below.
        GTY961913Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
        *a Component without harness connected
        (Heater Control Cable Sub-assembly)
        *b Side with Printed Characters
        *c Side without Printed Characters - -

        Standard

        Tester Connection Specified Condition
        1-1 Below 1 Ω
        2-2 Below 1 Ω
        3-3 Below 1 Ω
        4-4 Below 1 Ω
        5-5 Below 1 Ω
        6-6 Below 1 Ω
        7-7 Below 1 Ω

        If the result is not as specified, replace the heater control cable sub-assembly.