LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2019 >> LS 500 Base, AWD >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Meter / Gauge System - Diagnostic Codes (1 Of 2) >> Meter / Gauge System >> DTC B1501-13: Sub Fuel Sender Circuit Open [12/2017 - 10/2023] >> Procedure

DTC B1501-13: Sub Fuel Sender Circuit Open [12/2017 - 10/2023]: Procedure

  1. READ VALUE USING TECHSTREAM (SUB FUEL INPUT) 
    1. Connect the Techstream to the DLC3.
    2. Turn the engine switch on (IG).
    3. Turn the Techstream on.
    4. Enter the following menus: Body Electrical / Combination Meter / Data List.
    5. Read the Data List according to the display on the Techstream.

      Body Electrical > Combination Meter > Data List 

      Tester Display Measurement Item Range Normal Condition Diagnostic Note
      Sub Fuel Input Sub fuel input Min.: 0 L, Max.: 655.35 L
      • Fuel receiver gauge indicates

        F: 80.8 L

      • Fuel receiver gauge indicates

        3/4: 51.6 L

      • Fuel receiver gauge indicates

        1/4: 28.8 L

      • Fuel receiver gauge indicates

        E: 4.6 L

      Unit: Liter

      Body Electrical > Combination Meter > Data List 

      Tester Display
      Sub Fuel Input

      Result

      Result Proceed to
      Fuel level data can be displayed on the Techstream A
      Fuel level data cannot be displayed on the Techstream B

    Result: 

    REPLACE COMBINATION METER ASSEMBLY. Refer to  REMOVAL [12/2017 - 10/2020]  , or refer to  REMOVAL [10/2020 - 10/2023] 

    Result: 

    See step  2

  2. CHECK NO. 2 FUEL SENDER GAUGE ASSEMBLY (POWER SOURCE) 
    GTY831062Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    *a Component with harness connected
    (Combination Meter Assembly)
    1. Measure the voltage according to the value(s) in the table below.

      Standard Voltage

      Tester Connection Switch Condition Specified Condition
      G34-34 (FV) - Body ground Engine switch on (IG) 4.5 to 5.5 V

      Result

      Proceed to
      OK
      NG

    Result: 

    NG 

    REPLACE COMBINATION METER ASSEMBLY. Refer to  REMOVAL [12/2017 - 10/2020]  , or refer to  REMOVAL [10/2020 - 10/2023] 

    Result: 

    OK 

    See step  3

  3. CHECK NO. 2 FUEL SENDER GAUGE ASSEMBLY 
    GTY792383Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    *a Component with harness connected
    (Combination Meter Assembly)
    1. Measure the voltage according to the value(s) in the table below.

      Standard Voltage

      Tester Connection Switch Condition Specified Condition
      G34-33 (FR) - G34-32 (FE) Engine switch on (IG) 0.2 to 4.7 V

      Result

      Proceed to
      OK
      NG

    Result: 

    OK 

    REPLACE COMBINATION METER ASSEMBLY. Refer to  REMOVAL [12/2017 - 10/2020]  , or refer to  REMOVAL [10/2020 - 10/2023] 

    Result: 

    NG 

    See step  4

  4. CHECK HARNESS AND CONNECTOR (NO. 2 FUEL SENDER GAUGE ASSEMBLY - COMBINATION METER ASSEMBLY) 
    1. Disconnect the L38 No. 2 fuel sender gauge assembly connector.
    2. Disconnect the G34 combination meter assembly connector.
    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance

      Tester Connection Condition Specified Condition
      L38-3 (FR2) - G34-33 (FR) Always Below 1 Ω
      L38-2 (FE2) - G34-32 (FE) Always Below 1 Ω
      L38-1 (FV2) - G34-34 (FV) Always Below 1 Ω
      G34-33 (FR) - Body ground Always 10 kΩ or higher
      G34-32 (FE) - Body ground Always 10 kΩ or higher
      G34-34 (FV) - Body ground Always 10 kΩ or higher

      Result

      Proceed to
      OK
      NG

    Result: 

    NG 

    REPAIR OR REPLACE HARNESS OR CONNECTOR 

    Result: 

    OK 

    See step  5

  5. INSPECT NO. 2 FUEL SENDER GAUGE ASSEMBLY 
    1. Remove the No. 2 fuel sender gauge assembly.

      Refer to REMOVAL [12/2017 - 09/2018] , or refer to REMOVAL [09/2018 - 10/2020] , or refer to REMOVAL [10/2020 - 10/2022] , or refer to REMOVAL [10/2022 - 10/2023]

    2. Inspect the No. 2 fuel sender gauge assembly.

      Refer to INSPECTION [12/2017 - ]

      Result

      Proceed to
      OK
      NG

    Result: 

    OK 

    REPLACE COMBINATION METER ASSEMBLY. Refer to  REMOVAL [12/2017 - 10/2020]  , or refer to  REMOVAL [10/2020 - 10/2023] 

    Result: 

    NG 

    REPLACE NO. 2 FUEL SENDER GAUGE ASSEMBLY. Refer to  REMOVAL [12/2017 - 09/2018]  , or refer to  REMOVAL [09/2018 - 10/2020]  , or refer to  REMOVAL [10/2020 - 10/2022]  , or refer to  REMOVAL [10/2022 - 10/2023]