Replacement [03/2017 - 09/2023]: Procedure
- REMOVE V-BANK COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 1
- REMOVE RADIATOR SUPPORT TO FRAME SEAL LH
Refer to PROCEDURE - Step 2
- REMOVE RADIATOR SUPPORT TO FRAME SEAL RH
Refer to PROCEDURE - Step 3
- REMOVE LOWER RADIATOR AIR DEFLECTOR
Refer to PROCEDURE - Step 4
- REMOVE NO. 1 ENGINE UNDER COVER ASSEMBLY
Refer to PROCEDURE - Step 5
- REMOVE NO. 2 ENGINE UNDER COVER ASSEMBLY
Refer to PROCEDURE - Step 6
- DRAIN ENGINE COOLANT
Refer to PROCEDURE - Step 7
- ADD ENGINE COOLANT
Refer to PROCEDURE - Step 8
- INSPECT FOR COOLANT LEAK
Refer to PROCEDURE - Step 3
- INSTALL NO. 2 ENGINE UNDER COVER ASSEMBLY
Refer to PROCEDURE - Step 10
- INSTALL NO. 1 ENGINE UNDER COVER ASSEMBLY
Refer to PROCEDURE - Step 11
- INSTALL LOWER RADIATOR AIR DEFLECTOR
Refer to PROCEDURE - Step 12
- INSTALL RADIATOR SUPPORT TO FRAME SEAL RH
Refer to PROCEDURE - Step 13
- INSTALL RADIATOR SUPPORT TO FRAME SEAL LH
Refer to PROCEDURE - Step 14
- INSTALL V-BANK COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 15