LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2019 >> IS 350 Base, RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 95 (Engine Cooling System (2GR-FSE) - Service Information) >> Cooling Fan Motor >> Installation [04/2013 - 10/2017] >> Procedure

Installation [04/2013 - 10/2017]: Procedure

WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 2017 Lexus IS 350, 2017 Lexus IS 300, 2016 Lexus IS 350, 2016 Lexus IS 300, and 2015 Lexus IS 350. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL NO. 2 COOLING FAN MOTOR 
    1. Install the No. 2 cooling fan motor with the 3 screws.

      Torque: 3.9 N*m (40 kgf*cm, 35 in.*lbf) 

  2. INSTALL COOLING FAN MOTOR 
    1. Install the cooling fan motor with the 3 screws.

      Torque: 3.9 N*m (40 kgf*cm, 35 in.*lbf) 

  3. INSTALL NO. 2 FAN 
    NOTE:

    Do not reverse the position of the fan and No. 2 fan when installing them. Doing so may damage the parts.

    1. Install the No. 2 fan with the nut.

      Torque: 6.3 N*m (64 kgf*cm, 56 in.*lbf) 

  4. INSTALL FAN 
    NOTE:

    Do not reverse the position of the fan and No. 2 fan when installing them. Doing so may damage the parts.

    1. Install the fan with the nut.

      Torque: 6.3 N*m (64 kgf*cm, 56 in.*lbf) 

  5. INSTALL COOLING FAN ECU 
    1. Install the cooling fan ECU with the 2 screws.

      Torque: 2.6 N*m (27 kgf*cm, 23 in.*lbf) 

    2. Connect the 4 clamps and wire harness.
    3. Connect the cooling fan motor connector and No. 2 cooling fan motor connector.
  6. INSTALL FAN SHROUD ASSEMBLY 
    1. Engage the 3 guides.
    2. Engage the 3 claws and install the fan shroud assembly to the radiator assembly.
      NOTE:

      Do not damage the radiator assembly when installing the fan shroud assembly.

  7. INSTALL ENGINE ROOM ECU OUTLET DUCT 

    See step  4

  8. CONNECT ENGINE ROOM MAIN WIRE 

    See step  7

  9. INSTALL RADIATOR RESERVE TANK ASSEMBLY 

    See step  10

  10. CONNECT NO. 2 RADIATOR HOSE 

    See step  8

  11. INSTALL NO. 1 RADIATOR HOSE 

    See step  9

  12. INSTALL INLET NO. 1 AIR CLEANER 

    Refer to PROCEDURE - Step 75 [04/2013 - 08/2015] , or refer to PROCEDURE - Step 76 [08/2015 - 10/2016] , or refer to PROCEDURE - Step 77 [10/2016 - 10/2017]

  13. ADD ENGINE COOLANT 

    See step  5[04/2013 - 08/2015], or see step  5[08/2015 - 10/2017]

  14. INSPECT FOR COOLANT LEAK 

    Refer to PROCEDURE - Step 1

  15. INSTALL ENGINE UNDER COVER 
  16. INSTALL V-BANK COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 105 [04/2013 - 08/2015] , or refer to PROCEDURE - Step 106 [08/2015 - 10/2016] , or refer to PROCEDURE - Step 106 [10/2016 - 10/2017]

  17. INSTALL COOL AIR INTAKE DUCT SEAL 

    Refer to PROCEDURE - Step 3 [04/2013 - 10/2016] , or refer to PROCEDURE - Step 2 [10/2016 - 09/2020]