LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2019 >> IS 350 Base, RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 68 (Engine Mechanical System (2GR-FSE) - Service Information (1 Of 2)) >> Drive Belt >> Installation [04/2013 - 10/2017] >> Procedure

Installation [04/2013 - 10/2017]: Procedure

WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 2017 Lexus IS 350, 2017 Lexus IS 300, 2016 Lexus IS 350, 2016 Lexus IS 300, and 2015 Lexus IS 350. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL V-RIBBED BELT 
    1. Set the V-ribbed belt onto every pulley.
      Fig 1: Engine Drive Belt Routing Diagram
      GTY462821Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *1 Water Pump Assembly
      *2 Generator Assembly
      *3 No. 2 Idler Pulley Sub-assembly
      *4 V-ribbed Belt Tensioner Assembly
      *5 Crankshaft Pulley
      *6 Compressor and Magnetic Clutch Assembly
      NOTE:
      • Put the backside of the V-ribbed belt on the V-ribbed belt tensioner pulley and No. 2 idler pulley sub-assembly.
      • Check that the V-ribbed belt is properly set to each pulley.
    2. While turning the V-ribbed belt tensioner assembly counterclockwise, remove the bar.
    3. If it is difficult to install the V-ribbed belt, perform the following procedure.
      GTY135233Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    4. Check that the V-ribbed belt fits properly in the ribbed grooves.

      HINT: 

      Make sure to check by hand that the V-ribbed belt has not slipped out of the grooves on the bottom of the crankshaft pulley.

  2. INSTALL V-BANK COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 105 [04/2013 - 08/2015] , or refer to PROCEDURE - Step 106 [08/2015 - 10/2016] , or refer to PROCEDURE - Step 106 [10/2016 - 10/2017]

  3. INSTALL INLET NO. 1 AIR CLEANER 

    Refer to PROCEDURE - Step 75 [04/2013 - 08/2015] , or refer to PROCEDURE - Step 76 [08/2015 - 10/2016] , or refer to PROCEDURE - Step 77 [10/2016 - 10/2017]

  4. INSTALL COOL AIR INTAKE DUCT SEAL 

    Refer to PROCEDURE - Step 3 [04/2013 - 10/2016] , or refer to PROCEDURE - Step 2 [10/2016 - 09/2020]