Installation [10/2015 - ]: Procedure
- INSTALL COMBINATION METER ASSEMBLY
- INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY
Refer to PROCEDURE - Step 22
- INSTALL INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY
Refer to PROCEDURE - Step 23
- INSTALL NO. 1 INSTRUMENT PANEL SAFETY PAD SUB-ASSEMBLY
Refer to INSTALLATION [10/2015 - ]
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Refer to PROCEDURE - Step 2
NOTE:When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [10/2015 - 09/2016] , or Refer to INITIALIZATION [09/2016 - 09/2017] , or Refer to INITIALIZATION [09/2017 - ]
- CUSTOMIZE POWER TILT AND POWER TELESCOPIC STEERING COLUMN SYSTEM
Refer to PROCEDURE - Step 15