Installation [06/2018 - 08/2020]: Procedure
- INSTALL SUSPENSION TOWER DAMPER
- Install the suspension tower damper to the front bumper extension sub-assembly LH and front bumper extension sub-assembly RH with the 4 bolts.
Torque: 27.5 N.m (280 kgf/cm, 20 ft.lbf)
NOTE:Do not extend or compress the damper.
- Install the suspension tower damper to the front bumper extension sub-assembly LH and front bumper extension sub-assembly RH with the 4 bolts.
- INSTALL NO. 1 ENGINE UNDER COVER
for A25A-FXS: Refer to PROCEDURE - Step 43
for 2GR-FKS: Refer to PROCEDURE - Step 70
- INSTALL FRONT WHEEL OPENING EXTENSION PAD LH
for A25A-FXS: Refer to PROCEDURE - Step 44
for 2GR-FKS: Refer to PROCEDURE - Step 71
- INSTALL FRONT WHEEL OPENING EXTENSION PAD RH
for A25A-FXS: Refer to PROCEDURE - Step 45
for 2GR-FKS: Refer to PROCEDURE - Step 72