LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2019 >> ES 350 Luxury >> Repair and Diagnosis >> External Pages >> Different car >> Section 42 (Engine Starting System (A25A-FKS) - Service Information) >> Engine Switch >> Installation [08/2020 - 08/2021] >> Procedure

Installation [08/2020 - 08/2021]: Procedure

WARNING: This page is about a different car, the 2024 Lexus ES 250, 2023 Lexus ES 250, 2022 Lexus ES 250, and 2021 Lexus ES 250. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL ENGINE SWITCH 
    1. Attach the 2 claws to install the engine switch as shown in the illustration.
      GTY828259Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      Install in this Direction
  2. INSTALL SWITCH BASE 

    Refer to PROCEDURE - Step 5

  3. INSTALL INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY 

    Refer to PROCEDURE - Step 2

  4. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH 

    Refer to PROCEDURE - Step 18

  5. INSTALL UPPER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 22

  6. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY (w/o Headup Display) 

    Refer to PROCEDURE - Step 23

  7. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY (w/ Headup Display) 

    Refer to PROCEDURE - Step 24

  8. INSTALL AIR CONDITIONING CONTROL ASSEMBLY 

    Refer to PROCEDURE - Step 1

  9. INSTALL NO. 2 INSTRUMENT CLUSTER MOULDING 

    Refer to PROCEDURE - Step 25

  10. INSTALL LOWER INSTRUMENT PANEL SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 28

  11. INSTALL INSTRUMENT SIDE PANEL RH 

    Refer to PROCEDURE - Step 32

  12. INSTALL FRONT DOOR OPENING TRIM COVER RH 

    HINT: 

    Use the same procedure as for the LH side.

  13. INSTALL COWL SIDE TRIM BOARD RH 

    HINT: 

    Use the same procedure as for the LH side.

  14. INSTALL FRONT DOOR SCUFF PLATE RH 

    HINT: 

    Use the same procedure as for the LH side.

  15. INSTALL LOWER INSTRUMENT PANEL 

    Refer to PROCEDURE - Step 37

  16. INSTALL INSTRUMENT PANEL FINISH PANEL END LH 

    Refer to PROCEDURE - Step 9

  17. INSTALL NO. 1 INSTRUMENT CLUSTER MOULDING 

    Refer to PROCEDURE - Step 38

  18. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 39

  19. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 40

  20. INSTALL INSTRUMENT SIDE PANEL LH 

    Refer to PROCEDURE - Step 41

  21. INSTALL FRONT DOOR OPENING TRIM COVER LH 

    Refer to PROCEDURE - Step 31

  22. INSTALL COWL SIDE TRIM BOARD LH 

    Refer to PROCEDURE - Step 32

  23. INSTALL FRONT DOOR SCUFF PLATE LH 

    Refer to PROCEDURE - Step 33