Installation [08/2020 - ]: Procedure
- INSTALL HYBRID BATTERY TERMINAL BLOCK WARNING:
Be sure to wear insulated gloves and protective goggles.
- Engage the claw to install the hybrid battery terminal block to the HV battery.
- Connect the hybrid battery terminal block connector.NOTE:
Make sure that the connector is connected securely.
- INSTALL HV BATTERY JUNCTION BLOCK ASSEMBLY WARNING:
Be sure to wear insulated gloves and protective goggles.
- Install the HV battery junction block assembly to the HV battery with the 4 nuts.
Torque: 7.5 N.m (76 kgf/cm, 66 in.lbf)
NOTE:If the HV battery junction block assembly has been struck or dropped, replace it with a new one.
- Connect the 2 HV battery junction block assembly connectors.NOTE:
Make sure that the connectors are connected securely.
- Install the electric vehicle battery plug assembly to the HV battery with the bolt.
Torque: 7.5 N.m (76 kgf/cm, 66 in.lbf)
- Connect the hybrid battery terminal block connector.NOTE:
Make sure that the connector is connected securely.
- Connect the HV battery junction block assembly connector.NOTE:
Make sure that the connector is connected securely.
- Engage the 2 claws to close the wiring harness protector.
- Install the HV battery junction block assembly to the HV battery with the 4 nuts.
- CONNECT FLOOR WIRE
Refer to PROCEDURE - Step 12
- CONNECT FLOOR UNDER WIRE
Refer to PROCEDURE - Step 13
- INSTALL NO. 1 HV BATTERY COVER PANEL RH
Refer to PROCEDURE - Step 14
- INSTALL REAR SEAT CUSHION LEG SUB-ASSEMBLY
See step 4
- INSTALL REAR UNDER COVER
See step 5
- INSTALL REAR UNDER SIDE COVER LH
See step 6
- INSTALL REAR DOOR SCUFF PLATE LH
Refer to PROCEDURE - Step 29
- INSTALL REAR UNDER SIDE COVER RH
See step 8
- INSTALL REAR DOOR SCUFF PLATE RH
HINT:
Use the same procedure as for the LH side.
- INSTALL REAR SEAT CUSHION LOCK HOOK
Refer to PROCEDURE - Step 4 [08/2020 - 08/2021] , or refer to PROCEDURE - Step 4 [08/2021 - ]
- INSTALL REAR SEAT CUSHION ASSEMBLY
Refer to PROCEDURE - Step 5 [08/2020 - 08/2021] , or refer to PROCEDURE - Step 5 [08/2021 - ]
- INSTALL SERVICE PLUG GRIP
Refer to INSTALLATION [06/2018 - ]
- PERFORM INITIALIZATION
Refer to INITIALIZATION [08/2020 - 08/2021] , or refer to INITIALIZATION [08/2021 - 09/2022] , or refer to INITIALIZATION [09/2022 - ]