Power Switch Illumination Circuit [06/2018 - ]: Procedure
- PERFORM ACTIVE TEST USING TECHSTREAM
- Connect the Techstream to the DLC3.
- Turn the power switch on (IG).
- Turn the Techstream on.
- Enter the following menus: Body Electrical / Smart Access / Active Test.
- Perform the Active Test according to the display on the Techstream.
Body Electrical > Smart Access > Active Test
Tester Display Measurement Item Control Range Diagnostic Note Power/Engine SW Light Power switch illumination OFF or ON - Body Electrical > Smart Access > Active Test
Tester Display Power/Engine SW Light OK
Power switch illumination comes on.
Result
Proceed to OK NG
Result:
OK
PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE. Refer to PROBLEM SYMPTOMS TABLE [06/2018 - ]
Result:
NG
See step 2
- INSPECT POWER SWITCH
- Remove the power switch.
Refer to REMOVAL [06/2018 - 08/2021] , or refer to REMOVAL [08/2021 - ]
- Inspect the power switch.
Refer to INSPECTION [06/2018 - ]
Result
Proceed to OK NG
Result:
NG
REPLACE POWER SWITCH. Refer to REMOVAL [06/2018 - 08/2021] , or refer to REMOVAL [08/2021 - ]
Result:
OK
See step 3
- Remove the power switch.
- CHECK HARNESS AND CONNECTOR (POWER SWITCH - CERTIFICATION ECU (SMART KEY ECU ASSEMBLY))
- Disconnect the G47 certification ECU (smart key ECU assembly) connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition G49-9 (SWIL) - G47-10 (SWIL) Always Below 1 Ω G49-6 (AGND) - G47-11 (AGND) Always Below 1 Ω G49-9 (SWIL) or G47-10 (SWIL) - Body ground Always 10 kΩ or higher G49-6 (AGND) or G47-11 (AGND) - Body ground Always 10 kΩ or higher Result
Proceed to OK NG
Result:
OK
REPLACE CERTIFICATION ECU (SMART KEY ECU ASSEMBLY). Refer to REMOVAL [06/2018 - 08/2021] , or refer to REMOVAL [08/2021 - 09/2022] , or refer to REMOVAL [09/2022 - ]
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR