  1. INSTALL POWER SWITCH 
    1. Attach the claw to install the power switch as shown in the illustration.
      GTY828259Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      Install in this Direction
  2. INSTALL SWITCH BASE 

    Refer to PROCEDURE - Step 5

  3. INSTALL INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY 

    Refer to PROCEDURE - Step 2

  4. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH 

    Refer to PROCEDURE - Step 18

  5. INSTALL UPPER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 22

  6. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY (w/o Headup Display) 

    Refer to PROCEDURE - Step 23

  7. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY (w/ Headup Display) 

    Refer to PROCEDURE - Step 24

  8. INSTALL AIR CONDITIONING CONTROL ASSEMBLY 

    Refer to PROCEDURE - Step 1

  9. INSTALL NO. 2 INSTRUMENT CLUSTER MOULDING 

    Refer to PROCEDURE - Step 25

  10. INSTALL LOWER INSTRUMENT PANEL SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 28

  11. INSTALL INSTRUMENT SIDE PANEL RH 

    Refer to PROCEDURE - Step 32

  12. INSTALL FRONT DOOR OPENING TRIM COVER RH 

    HINT: 

    Use the same procedure as for the LH side.

  13. INSTALL COWL SIDE TRIM BOARD RH 

    HINT: 

    Use the same procedure as for the LH side.

  14. INSTALL FRONT DOOR SCUFF PLATE RH 

    HINT: 

    Use the same procedure as for the LH side.

  15. INSTALL LOWER INSTRUMENT PANEL 

    Refer to PROCEDURE - Step 37

  16. INSTALL INSTRUMENT PANEL FINISH PANEL END LH 

    Refer to PROCEDURE - Step 9 [06/2018 - 08/2020] , or refer to PROCEDURE - Step 9 [08/2020 - 09/2022]

  17. INSTALL NO. 1 INSTRUMENT CLUSTER MOULDING 

    Refer to PROCEDURE - Step 38

  18. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 39

  19. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 40

  20. INSTALL INSTRUMENT SIDE PANEL LH 

    Refer to PROCEDURE - Step 41

  21. INSTALL FRONT DOOR OPENING TRIM COVER LH 

    Refer to PROCEDURE - Step 31

  22. INSTALL COWL SIDE TRIM BOARD LH 

    Refer to PROCEDURE - Step 32

  23. INSTALL FRONT DOOR SCUFF PLATE LH 

    Refer to PROCEDURE - Step 33