Installation [12/2017 - ]: Procedure
- INSTALL ELECTRIC WATER PUMP ASSEMBLY
- Install the electric water pump assembly to the water pump bracket sub-assembly with the 2 bolts.
Torque: 8.0 N.m (82 kgf/cm, 71 in.lbf)
- Install the electric water pump assembly to the water pump bracket sub-assembly with the 2 bolts.
- INSTALL WATER PUMP BRACKET SUB-ASSEMBLY
- for 2WD:
- Install the water pump bracket sub-assembly with the 3 bolts.
Torque: 8.0 N.m (82 kgf/cm, 71 in.lbf)
- Install the water pump bracket sub-assembly with the 3 bolts.
- for AWD:
- Install the water pump bracket sub-assembly with the 3 bolts.
Torque: 8.0 N.m (82 kgf/cm, 71 in.lbf)
- Install the water pump bracket sub-assembly with the 3 bolts.
- Connect the connector and attach the clamp.
- for 2WD:
- CONNECT INTERCOOLER COOLING WATER INLET HOSE
- Connect the intercooler cooling water hose to the electric water pump assembly, and slide the clip to secure the hose.NOTE:
- Install so that the intercooler cooling water hose paint mark and electric water pump assembly positioning stopper are securely overlapped.
- Install the clip so that it faces the rear of the vehicle from the intercooler cooling water inlet hose.
- Connect the intercooler cooling water hose to the electric water pump assembly, and slide the clip to secure the hose.
- INSTALL INTERCOOLER RESERVE TANK ASSEMBLY
Refer to PROCEDURE - Step 33
- INSTALL AIR CLEANER ASSEMBLY LH
Refer to PROCEDURE - Step 127 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 127 [09/2018 - 10/2020] , or refer to PROCEDURE - Step 127 [10/2020 - 10/2023] , or refer to PROCEDURE - Step 127 [10/2023 - ]
- INSTALL RADIATOR SUPPORT TO CROSSMEMBER BRACE SUB-ASSEMBLY RH
Refer to PROCEDURE - Step 7
- INSTALL RADIATOR SUPPORT TO CROSSMEMBER BRACE SUB-ASSEMBLY LH
Refer to PROCEDURE - Step 8
- INSTALL LOWER RADIATOR AIR DEFLECTOR
Refer to PROCEDURE - Step 8
- INSTALL UPPER RADIATOR SUPPORT SEAL
Refer to PROCEDURE - Step 9
- INSTALL RADIATOR COVER PLATE
Refer to PROCEDURE - Step 10
- INSTALL V-BANK COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 192 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 192 [09/2018 - 10/2020] , or refer to PROCEDURE - Step 193 [10/2020 - 10/2023] , or refer to PROCEDURE - Step 192 [10/2023 - ]
- ADD COOLANT (for Intercooler)
Refer to PROCEDURE - Step 5
- INSPECT FOR COOLANT LEAK (for Intercooler)
See step 1