LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2018 >> ES 350 >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Meter / Gauge System (Service Information) >> Combination Meter >> Installation [07/2015 - ] >> Procedure

Installation [07/2015 - ]: Procedure

  1. INSTALL COMBINATION METER ASSEMBLY 
    1. Connect the 2 connectors.
    2. Engage the 2 clips.
    3. Install the combination meter assembly with the 2 screws.
  2. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY 
    1. Engage the 5 claws and 2 guides.
    2. Install the 2 screws.
    3. Engage the 4 clips and 2 guides to install the instrument cluster finish panel sub-assembly.
      GTY400159Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL (for Manual Tilt and Manual Telescopic Steering Column) 
    NOTE:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Refer to INITIALIZATION [07/2015 - ] ).

  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL (for Power Tilt and Power Telescopic Steering Column) 
    NOTE: