DTC P2816-13: Pressure Control Solenoid "H" Circuit Open [11/2017 - ]: Procedure
WARNING: This page does not describe the selected car, but rather 7 other vehicles, including the 2024 Lexus RC 350, 2023 Lexus RC 350, 2022 Lexus RC 350, 2021 Lexus RC 350, and 2020 Lexus RC 350. However, it is still accessible from the selected car via links, so may be relevant.
- CHECK HARNESS AND CONNECTOR (TRANSMISSION WIRE (SHIFT SOLENOID VALVE SL5) - ECM)
- Disconnect the F87 ECM connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition F87-10 (SL5+) - F87-11 (SL5-) 20°C (68°F) 5.0 to 5.6 Ω F87-10 (SL5+) or F87-11 (SL5-) - Body ground Always 10 kΩ or higher Result
Proceed to OK NG
Result:
NG
See step 3
Result:
OK
See step 2
- REPLACE ECM
- Replace the ECM.
Refer to COMPONENTS [11/2017 - ]
Result
Proceed to NEXT
Result:
NEXT
PERFORM A/T CODE REGISTRATION. Refer to REGISTRATION [11/2017 - ]
- Replace the ECM.
- CHECK HARNESS AND CONNECTOR (TRANSMISSION WIRE - ECM)
- Disconnect the F61 transmission wire connector.
- Disconnect the F87 ECM connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition F61-5 (SL5+) - F87-10 (SL5+) Always Below 1 Ω F61-6 (SL5-) - F87-11 (SL5-) Always Below 1 Ω F61-5 (SL5+) or F87-10 (SL5+) - Body ground Always 10 kΩ or higher F61-6 (SL5-) or F87-11 (SL5-) - Body ground Always 10 kΩ or higher Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 4
- INSPECT SHIFT SOLENOID VALVE SL5
- Remove the shift solenoid valve SL5.
*1 Shift Solenoid Valve SL5 Refer to DISASSEMBLY [09/2014 - ]
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition Terminal 1 of the shift solenoid valve SL5 - terminal 2 20°C (68°F) 5.0 to 5.6 Ω - Connect a positive (+) lead from the battery with a 21 W bulb to terminal 1 and a negative (-) lead to terminal 2 of the shift solenoid valve connector. Check that the valve moves and makes an operating sound.
OK
Valve moves and makes an operating sound.
Result
Proceed to OK NG
Result:
OK
REPAIR OR REPLACE TRANSMISSION WIRE. Refer to COMPONENTS [09/2014 - ]
Result:
NG
REPLACE SHIFT SOLENOID VALVE SL5. Refer to COMPONENTS [09/2014 - ]
- Remove the shift solenoid valve SL5.