Installation [09/2015 - ]: Procedure
- INSTALL METER MIRROR SUB-ASSEMBLY (HEADUP DISPLAY)
- INSTALL NO. 1 HEATER TO REGISTER DUCT SUB-ASSEMBLY
Refer to PROCEDURE - Step 14 [09/2015 - 08/2020] Refer to PROCEDURE - Step 14 [08/2020 - ]
- INSTALL CENTER HEATER TO REGISTER DUCT
Refer to PROCEDURE - Step 15 [09/2015 - 08/2020] Refer to PROCEDURE - Step 15 [08/2020 - ]
- INSTALL INSTRUMENT PANEL SAFETY PAD ASSEMBLY
(Refer to INSTALLATION [09/2015 - ] )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Refer to INITIALIZATION [09/2015 - 08/2019] Refer to INITIALIZATION [08/2019 - ] .
- CHARGE REFRIGERANT (w/ Cool Box)
Refer to PROCEDURE - Step 2 [09/2015 - 08/2020] Refer to PROCEDURE - Step 1 [08/2020 - ]
- WARM UP ENGINE (w/ Cool Box)
Refer to PROCEDURE - Step 3 [09/2015 - 08/2020] Refer to PROCEDURE - Step 3 [08/2020 - ]
- CHECK FOR REFRIGERANT GAS LEAK (w/ Cool Box)
Refer to PROCEDURE - Step 4 [09/2015 - 08/2020] Refer to PROCEDURE - Step 1 [08/2020 - ]
- ENABLE AUTOAWAY/RETURN FUNCTION
- Restore the autoaway/return function setting to the previous condition by changing the customize parameter (Refer to CUSTOMIZE PARAMETERS [09/2015 - ] .
- CHECK SRS WARNING LIGHT
(Refer to DIAGNOSIS SYSTEM [09/2015 - 08/2020] Refer to DIAGNOSIS SYSTEM [08/2020 - ] )
- INSTALL UPPER RADIATOR SUPPORT SEAL
Refer to PROCEDURE - Step 14