Inspection [11/2021 - ]: Procedure
WARNING: This page is about a different car, the 2024 Lexus IS 500, 2023 Lexus IS 500, and 2022 Lexus IS 500. However, it is still accessible from the selected car via links, so may be relevant.
- INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
- Measure the resistance according to the value(s) in the table below.
*a Component without harness connected
(Park/Neutral Position Switch Assembly)Standard Resistance
Tester Connection Condition Specified Condition 2 (RB) - 6 (PL)
4 (B) - 5 (L)Shift lever in P Below 1 Ω 2 (RB) - 1 (RL) Shift lever in R Below 1 Ω 2 (RB) - 9 (NL)
4 (B) - 5 (L)Shift lever in N Below 1 Ω 2 (RB) - 7 (DL) Shift lever in D, M, "+" or "-" Below 1 Ω Shift lever not in D, M, "+" or "-" 10 kΩ or higher 2 (RB) - 6 (PL) Shift lever not in P 10 kΩ or higher 2 (RB) - 1 (RL) Shift lever not in R 10 kΩ or higher 2(RB) - 9(NL) Shift lever not in N 10 kΩ or higher 4 (B) - 5 (L) Shift lever not in P or N 10 kΩ or higher If the result is not as specified, replace the park/neutral position switch assembly.
- Measure the resistance according to the value(s) in the table below.