LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2017 >> IS 300 F Sport >> Repair and Diagnosis >> External Pages >> Different car >> Section 6 (Automatic Transmission System (Aa81E) - Service Information (1 Of 2)) >> VALVE BODY ASSEMBLY (for 2GR) >> Inspection [04/2013 - ] >> Procedure

Inspection [04/2013 - ]: Procedure

WARNING: This page does not describe the selected car, but rather 20 other vehicles, including the 2024 Lexus IS 350, 2024 Lexus IS 300, 2023 Lexus IS 350, 2023 Lexus IS 300, and 2022 Lexus IS 350. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSPECT SHIFT SOLENOID VALVE SL1 
    GTY464575Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    *a Component without harness connected
    (Shift Solenoid Valve SL1)
    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance

      Tester Connection Condition Specified Condition
      1 - 2 20°C (68°F) 5.0 to 5.6 Ω
    2. Connect the positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the shift solenoid valve SL1 connector, then check the movement of the valve.

      OK

      The solenoid makes an operating sound.

      If the result is not as specified, replace the shift solenoid valve SL1.

  2. INSPECT SHIFT SOLENOID VALVE SL2 

    HINT: 

    Refer to the procedures for the shift solenoid valve SL1.

  3. INSPECT SHIFT SOLENOID VALVE SL3 

    HINT: 

    Refer to the procedures for the shift solenoid valve SL1.

  4. INSPECT SHIFT SOLENOID VALVE SL4 

    HINT: 

    Refer to the procedures for the shift solenoid valve SL1.

  5. INSPECT SHIFT SOLENOID VALVE SL5 

    HINT: 

    Refer to the procedures for the shift solenoid valve SL1.

  6. INSPECT SHIFT SOLENOID VALVE SLU 

    HINT: 

    Refer to the procedures for the shift solenoid valve SL1.

  7. INSPECT SHIFT SOLENOID VALVE SLT 

    HINT: 

    Refer to the procedures for the shift solenoid valve SL1.

  8. INSPECT SHIFT SOLENOID VALVE SL 
    1. Measure the resistance according to the value(s) in the table below.
      GTY468974Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Component without harness connected
      (Shift Solenoid Valve SL)

      Standard Resistance

      Tester Connection Condition Specified Condition
      Shift solenoid valve SL connector terminal - Shift solenoid valve SL body 20°C (68°F) 11 to 15 Ω
    2. Connect the positive (+) lead to the terminal of the shift solenoid valve SL connector, and the negative (-) lead to the shift solenoid valve SL body.

      OK

      The solenoid makes an operating sound

      If the result is not as specified, replace the shift solenoid valve SL.

  9. INSPECT SHIFT SOLENOID VALVE SR 
    1. Measure the resistance according to the value(s) in the table below.
      GTY461450Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Component without harness connected
      (Shift Solenoid Valve SR)

      Standard Resistance

      Tester Connection Condition Specified Condition
      Shift solenoid valve SR connector terminal - Shift solenoid valve SR body 20°C (68°F) 11 to 15 Ω
    2. Connect the positive (+) lead to the terminal of the shift solenoid valve SR connector, and the negative (-) lead to the shift solenoid valve SR body.

      OK

      The solenoid makes an operating sound

      If the result is not as specified, replace the shift solenoid valve SR.