Adjustment [04/2013 - ]: Procedure
WARNING: This page does not describe the selected car, but rather 20 other vehicles, including the 2024 Lexus IS 350, 2024 Lexus IS 300, 2023 Lexus IS 350, 2023 Lexus IS 300, and 2022 Lexus IS 350. However, it is still accessible from the selected car via links, so may be relevant.
- SEPARATE TRANSMISSION CONTROL SHAFT LEVER RH
- Move the shift lever to N.
- Remove the nut and spring washer, and separate the transmission control shaft lever RH from the park/neutral position switch assembly.
- ADJUST PARK/NEUTRAL POSITION SWITCH ASSEMBLY
- Remove the bolt from the park/neutral position switch assembly.
*a Neutral Basic Line *b Groove - Clean the bolt and the bolt hole.
- Align the neutral basic line with the groove as shown in the illustration.
- Apply adhesive to 2 or 3 threads on the end of the bolt.
Adhesive
Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent
- Hold the park/neutral position switch assembly in that position and tighten the bolt.
Torque: 12.8 N*m (131 kgf*cm, 9 ft.*lbf)
- After the adjustment, perform the park/neutral position switch assembly operation check.
See step 1
- Remove the bolt from the park/neutral position switch assembly.
- INSTALL TRANSMISSION CONTROL SHAFT LEVER RH
- Connect the transmission control shaft lever RH to the park/neutral position switch assembly with the spring washer and nut.
Torque: 15.7 N*m (160 kgf*cm, 12 ft.*lbf)
- Connect the transmission control shaft lever RH to the park/neutral position switch assembly with the spring washer and nut.