LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2017 >> IS 300 F Sport >> Repair and Diagnosis >> External Pages >> Different car >> Section 57 (Fuel System (8AR-FTS) - Service Information) >> Fuel Pump Ecu >> Installation [09/2020 - ] >> Procedure

Installation [09/2020 - ]: Procedure

WARNING: This page does not describe the selected car, but rather 9 other vehicles, including the 2024 Lexus IS 300, 2023 Lexus IS 300, 2022 Lexus IS 300, 2021 Lexus IS 300, and 2020 Lexus IS 300. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL FUEL PUMP CONTROL ECU BRACKET 
    1. Install the fuel pump control ECU bracket with the 2 screws.

      Torque: 3.0 N.m (31 kgf/cm, 27 in.lbf) 

  2. INSTALL FUEL PUMP CONTROL ECU 
    1. Install the fuel pump control ECU to the vehicle body with the 2 nuts.

      Torque: 8.0 N.m (82 kgf/cm, 71 in.lbf) 

      NOTE:

      Do not reuse the fuel pump control ECU if it has been dropped or subjected to a severe impact.

    2. Connect the 2 fuel pump control ECU connectors.
    3. Install the luggage compartment trim cover LH with the 4 clips.
    4. Install the rope hook assembly with the bolt.
    5. Engage the 2 claws to close the cover.
  3. INSTALL FRONT UPPER LUGGAGE COMPARTMENT TRIM COVER 

    Refer to PROCEDURE - Step 6

  4. INSTALL NO. 1 LUGGAGE COMPARTMENT LIGHT ASSEMBLY 

    Refer to PROCEDURE - Step 2

  5. INSTALL FRONT LUGGAGE COMPARTMENT TRIM COVER 

    Refer to PROCEDURE - Step 12

  6. INSTALL REAR LUGGAGE COMPARTMENT TRIM COVER 

    Refer to PROCEDURE - Step 13

  7. INSTALL LUGGAGE COMPARTMENT DOOR STRIKER COVER 

    Refer to PROCEDURE - Step 14

  8. INSTALL DECK SIDE TRIM BOX RH 

    Refer to PROCEDURE - Step 15

  9. INSTALL DECK SIDE TRIM BOX LH 

    Refer to PROCEDURE - Step 16

  10. INSTALL SPARE WHEEL COVER TRAY RH 

    Refer to PROCEDURE - Step 17

  11. INSTALL SPARE WHEEL COVER TRAY LH 

    Refer to PROCEDURE - Step 18

  12. INSTALL LUGGAGE COMPARTMENT FLOOR MAT 

    Refer to PROCEDURE - Step 19