LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2017 >> IS 300 F Sport >> Repair and Diagnosis >> External Pages >> Different car >> Section 54 (Engine Control System (2GR-FKS) - Service Information) >> Ignition Coil And Spark Plug >> Installation [10/2017 - ] >> Procedure

Installation [10/2017 - ]: Procedure

WARNING: This page does not describe the selected car, but rather 14 other vehicles, including the 2024 Lexus IS 350, 2024 Lexus IS 300, 2023 Lexus IS 350, 2023 Lexus IS 300, and 2022 Lexus IS 350. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL SPARK PLUG 

    HINT: 

    Perform "Inspection After Repair" after replacing a spark plug.

    Refer to INITIALIZATION [10/2017 - 09/2018] , or refer to INITIALIZATION [09/2018 - 09/2020] , or refer to INITIALIZATION [09/2020 - ]

    1. Install the 6 spark plugs.

      Torque: 18 N.m (184 kgf/cm, 13 ft.lbf) 

      NOTE:

      If a spark plug has been struck or dropped, replace it.

      HINT: 

      Install the same parts to their original positions.

  2. INSTALL IGNITION COIL ASSEMBLY 

    HINT: 

    Perform "Inspection After Repair" after replacing an ignition coil assembly.

    Refer to INITIALIZATION [10/2017 - 09/2018] , or refer to INITIALIZATION [09/2018 - 09/2020] , or refer to INITIALIZATION [09/2020 - ]

    1. Install the 6 ignition coil assemblies with the 6 bolts.

      Torque: 10 N.m (102 kgf/cm, 7 ft.lbf) 

      NOTE:

      If an ignition coil assembly has been struck or dropped, replace it.

      HINT: 

      Install the same parts to their original positions.

    2. Connect the 6 ignition coil assembly connectors.
  3. CONNECT ENGINE WIRE 
    1. Connect the fuel pump assembly connector.
    2. Engage the clamp to connect the fuel tube sub-assembly.
    3. Connect the 2 VVT sensor connectors.
    4. Connect the engine wire to the cylinder head cover sub-assembly LH with the 2 nuts.

      Torque: 10 N.m (102 kgf/cm, 7 ft.lbf) 

    5. Engage the 4 clamps.
    6. Engage the clamp to connect the No. 2 fuel tube sub-assembly.
    7. Install the fuel hose clamp to the fuel tube connector.
    8. Engage the claw to close the cover of the fuel hose clamp.
    9. Connect the engine wire to the timing chain cover assembly with the bolt.

      Torque: 10 N.m (102 kgf/cm, 7 ft.lbf) 

    10. Connect the 2 camshaft timing oil control solenoid assembly connectors and water inlet with thermostat sub-assembly connector.
    11. Engage the clamp.
  4. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 5

  5. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE 

    See step  3 [10/2017 - 09/2020], or see step  3 [09/2020 - ]

  6. INSTALL V-BANK COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 104 [10/2017 - 09/2020] , or refer to PROCEDURE - Step 104 [09/2020 - ]

  7. PERFORM INITIALIZATION 
    1. Perform "Inspection After Repair" after replacing an ignition coil assembly or spark plug.

      Refer to INITIALIZATION [10/2017 - 09/2018] , or refer to INITIALIZATION [09/2018 - 09/2020] , or refer to INITIALIZATION [09/2020 - ]