LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2017 >> IS 300 F Sport >> Repair and Diagnosis >> External Pages >> Different car >> Section 127 (Automatic Transmission System (A960E) - Service Information) >> Valve Body Assembly >> Inspection [04/2013 - 08/2015] >> Procedure

Inspection [04/2013 - 08/2015]: Procedure

WARNING: This page is about a different car, the 2015 Lexus IS 250 and 2014 Lexus IS 250. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSPECT SHIFT SOLENOID VALVE SL1 
    1. Measure the resistance according to the value(s) in the table below.
      GTY464574Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Component without harness connected
      (Shift Solenoid Valve SL1)
      STANDARD RESISTANCE

      Tester Connection Condition Specified Condition
      1 - 2 20°C (68°F) 5.0 to 5.6 Ω
    2. Connect the positive (+) lead with a 21 W bulb to terminal 1 and the negative (-) lead to terminal 2 of the shift solenoid valve SL1 connector, then check the movement of the shift solenoid valve SL1.

      OK

      The solenoid makes an operating sound.

      If the result is not as specified, replace the shift solenoid valve SL1.

  2. INSPECT SHIFT SOLENOID VALVE SL2 
    1. Measure the resistance according to the value(s) in the table below.
      GTY464574Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Component without harness connected
      (Shift Solenoid Valve SL2)
      STANDARD RESISTANCE

      Tester Connection Condition Specified Condition
      1 - 2 20°C (68°F) 5.0 to 5.6 Ω
    2. Connect the positive (+) lead with a 21 W bulb to terminal 1 and the negative (-) lead to terminal 2 of the shift solenoid valve SL2 connector, then check the movement of the shift solenoid valve SL2.

      OK

      The solenoid makes an operating sound.

      If the result is not as specified, replace the shift solenoid valve SL2.

  3. INSPECT SHIFT SOLENOID VALVE S1 
    1. Measure the resistance according to the value(s) in the table below.
      GTY463872Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Component without harness connected
      (Shift Solenoid Valve S1)
      STANDARD RESISTANCE

      Tester Connection Condition Specified Condition
      Shift solenoid valve S1 connector terminal - Shift solenoid valve S1 body 15 to 25 °C (59 to 77 °F) 11 to 15 Ω
    2. Connect the positive (+) lead to the terminal of the shift solenoid valve connector, and the negative (-) lead to the shift solenoid valve S1 body.

      OK

      The solenoid makes an operating sound.

      If the result is not as specified, replace the shift solenoid valve S1.

  4. INSPECT SHIFT SOLENOID VALVE S3 
    1. Measure the resistance according to the value(s) in the table below.
      GTY463872Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Component without harness connected
      (Shift Solenoid Valve S3)
      STANDARD RESISTANCE

      Tester Connection Condition Specified Condition
      Shift solenoid valve S3 connector terminal - Shift solenoid valve S3 body 15 to 25 °C (59 to 77 °F) 11 to 15 Ω
    2. Connect the positive (+) lead to the terminal of the shift solenoid valve connector, and the negative (-) lead to the shift solenoid valve S3 body.

      OK

      The solenoid makes an operating sound.

      If the result is not as specified, replace the shift solenoid valve S3.

  5. INSPECT SHIFT SOLENOID VALVE S2 
    1. Measure the resistance according to the value(s) in the table below.
      GTY467091Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Component without harness connected
      (Shift Solenoid Valve S2)
      STANDARD RESISTANCE

      Tester Connection Condition Specified Condition
      Shift solenoid valve S2 connector terminal - Shift solenoid valve S2 body 15 to 25 °C (59 to 77 °F) 11 to 15 Ω
    2. Connect the positive (+) lead to the terminal of the shift solenoid valve S2 connector, and the negative (-) lead to the shift solenoid valve S2 body.

      OK

      The solenoid makes an operating sound.

      If the result is not as specified, replace the shift solenoid valve S2.

  6. INSPECT SHIFT SOLENOID VALVE S4 
    1. Measure the resistance according to the value(s) in the table below.
      GTY463912Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Component without harness connected
      (Shift Solenoid Valve S4)
      STANDARD RESISTANCE

      Tester Connection Condition Specified Condition
      Shift solenoid valve S4 connector terminal - Shift solenoid valve S4 body 15 to 25 °C (59 to 77 °F) 11 to 15 Ω
    2. Connect the positive (+) lead to the terminal of the shift solenoid valve S4 connector, and the negative (-) lead to the shift solenoid valve S4 body.

      OK

      The solenoid makes an operating sound.

      If the result is not as specified, replace the shift solenoid valve S4.

  7. INSPECT SHIFT SOLENOID VALVE SR 
    1. Measure the resistance according to the value(s) in the table below.
      GTY461852Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Component without harness connected
      (Shift Solenoid Valve SR)
      STANDARD RESISTANCE

      Tester Connection Condition Specified Condition
      Shift solenoid valve SR connector terminal - Shift solenoid valve SR body 15 to 25 °C (59 to 77 °F) 11 to 15 Ω
    2. Connect the positive (+) lead to the terminal of the shift solenoid valve SR connector, and the negative (-) lead to the shift solenoid valve SR body.

      OK

      The solenoid makes an operating sound.

      If the result is not as specified, replace the shift solenoid valve SR.

  8. INSPECT SHIFT SOLENOID VALVE SLT 
    1. Measure the resistance according to the value(s) in the table below.
      GTY458951Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Component without harness connected
      (Shift Solenoid Valve SLT)
      STANDARD RESISTANCE

      Tester Connection Condition Specified Condition
      1 - 2 20 °C (68 °F) 5.0 to 5.6 Ω
    2. Connect the positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the shift solenoid valve SLT connector, then check the movement of the valve.

      OK

      The solenoid makes an operating sound.

      If the result is not as specified, replace the shift solenoid valve SLT.

  9. INSPECT SHIFT SOLENOID VALVE SLU 
    1. Measure the resistance according to the value(s) in the table below.
      GTY458990Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Component without harness connected
      (Shift Solenoid Valve SLU)
      STANDARD RESISTANCE

      Tester Connection Condition Specified Condition
      1 - 2 20 °C (68 °F) 5.0 to 5.6 Ω
    2. Connect the positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the shift solenoid valve SLU connector, then check the movement of the valve.

      OK

      The solenoid makes an operating sound.

      If the result is not as specified, replace the shift solenoid valve SLU.