Installation [09/2014 - ]: Procedure
- INSTALL COMBINATION METER ASSEMBLY
- Connect the connectors and attach the clamp.
- Install the combination meter assembly with the 4 screws.
- INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY
Refer to PROCEDURE - Step 23 [09/2014 - 10/2015] or refer to PROCEDURE - Step 22 [10/2015 - ]
- INSTALL INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY
Refer to PROCEDURE - Step 24 [09/2014 - 10/2015] or refer to PROCEDURE - Step 23 [10/2015 - ]
- INSTALL NO. 1 INSTRUMENT PANEL SAFETY PAD SUB-ASSEMBLY
Refer to PROCEDURE - Step 26 [09/2014 - 10/2015] or refer to PROCEDURE - Step 25 [10/2015 - ]
- INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 27 [09/2014 - 10/2015] or refer to PROCEDURE - Step 26 [10/2015 - ]
- INSTALL NO. 1 INSTRUMENT PANEL GARNISH SUB-ASSEMBLY
Refer to PROCEDURE - Step 28 [09/2014 - 10/2015] or refer to PROCEDURE - Step 27 [10/2015 - ]
- INSTALL INSTRUMENT SIDE PANEL LH
Refer to PROCEDURE - Step 29 [09/2014 - 10/2015] or refer to PROCEDURE - Step 28 [10/2015 - ]
- INSTALL INSTRUMENT PANEL FINISH PANEL END LH
Refer to PROCEDURE - Step 6
- INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL
Refer to PROCEDURE - Step 8
- ENABLE AUTOAWAY/RETURN FUNCTION
- Restore the autoaway/return function setting to the previous condition by changing the customize parameter (Refer to CUSTOMIZE PARAMETERS [09/2014 - ] ).