Removal [09/2020 - ]: Procedure
- REMOVE FRONT EXHAUST PIPE ASSEMBLY (for 2GR-FKS)
Refer to REMOVAL [09/2020 - ]
- REMOVE FRONT EXHAUST PIPE ASSEMBLY (for 8AR-FTS)
Refer to REMOVAL [09/2020 - ]
- REMOVE FRONT NO. 1 FLOOR HEAT INSULATOR
Refer to PROCEDURE - Step 3
- SEPARATE FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY
- REMOVE CONSOLE BOX ASSEMBLY
Refer to REMOVAL [09/2020 - 11/2021] , or refer to REMOVAL [11/2021 - ]
- REMOVE NO. 1 CONSOLE BOX DUCT
- REMOVE TRANSMISSION FLOOR SHIFT ASSEMBLY