Installation [04/2013 - ]: Procedure

  1. INSTALL CLOCK ASSEMBLY 
    1. Engage the 2 claws to install the clock assembly.
  2. INSTALL CENTER INSTRUMENT PANEL REGISTER ASSEMBLY 

    Refer to PROCEDURE - Step 14 [04/2013 - 10/2016] , or refer to PROCEDURE - Step 14 [10/2016 - 10/2017] , or refer to PROCEDURE - Step 14 [10/2017 - 09/2020] , or refer to PROCEDURE - Step 14 [09/2020 - ]

  3. INSTALL AIR CONDITIONING CONTROL ASSEMBLY 

    Refer to INSTALLATION [04/2013 - ]

  4. INSTALL METER HOOD SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 31 [04/2013 - 10/2016] , or refer to PROCEDURE - Step 32 [10/2016 - 10/2017] , or refer to PROCEDURE - Step 32 [10/2017 - 09/2020] , or refer to PROCEDURE - Step 30 [09/2020 - ]

  5. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 34 [04/2013 - 10/2016] , or refer to PROCEDURE - Step 35 [10/2016 - 10/2017] , or refer to PROCEDURE - Step 35 [10/2017 - 09/2020] , or refer to PROCEDURE - Step 33 [09/2020 - ]

  6. CONNECT HOOD LOCK CONTROL LEVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 35 [04/2013 - 10/2016] , or refer to PROCEDURE - Step 36 [10/2016 - 10/2017] , or refer to PROCEDURE - Step 36 [10/2017 - 09/2020] , or refer to PROCEDURE - Step 34 [09/2020 - ]

  7. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 36 [04/2013 - 10/2016] , or refer to PROCEDURE - Step 37 [10/2016 - 10/2017] , or refer to PROCEDURE - Step 37 [10/2017 - 09/2020] , or refer to PROCEDURE - Step 35 [09/2020 - ]

  8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
    NOTE:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Refer to INITIALIZATION [04/2013 - 06/2014] , or refer to INITIALIZATION [06/2014 - 08/2015] , or refer to INITIALIZATION [08/2015 - 10/2016] , or refer to INITIALIZATION [10/2016 - 10/2017] , or refer to INITIALIZATION [10/2017 - 09/2020] , or refer to INITIALIZATION [09/2020 - 11/2021] , or refer to INITIALIZATION [11/2021 - 09/2022] , or refer to INITIALIZATION [09/2022 - 10/2023] , or refer to INITIALIZATION [10/2023 - ]

  9. CUSTOMIZE POWER TILT AND POWER TELESCOPIC STEERING COLUMN SYSTEM (for Power Tilt and Power Telescopic Steering Column) 

    Refer to PROCEDURE - Step 19 [04/2013 - 06/2014] , or refer to PROCEDURE - Step 19 [06/2014 - 08/2015] , or refer to PROCEDURE - Step 19 [08/2015 - 10/2016] , or refer to PROCEDURE - Step 16 [10/2016 - 10/2017] , or refer to PROCEDURE - Step 16 [10/2017 - 09/2020] , or refer to PROCEDURE - Step 16 [09/2020 - 11/2021] , or refer to PROCEDURE - Step 17 [11/2021 - ]