Installation [10/2014 - 05/2019]: Procedure
- INSTALL GENERATOR ASSEMBLY
- Install the 2 wire harness clamp brackets with the 2 bolts.
Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf)
- Install the generator assembly with the 2 bolts.
Torque: 43 N*m (438 kgf*cm, 32 ft.*lbf)
- Connect the generator connector to the generator assembly.
- Connect the wire harness to terminal B with the nut.
Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf)
- Install the terminal cap.
- Connect the crank position sensor connector and attach the 2 clamps.
- Install the 2 wire harness clamp brackets with the 2 bolts.
- INSTALL FRONT NO. 2 EXHAUST PIPE SUB-ASSEMBLY
Refer to PROCEDURE - Step 1 [10/2014 - ]
- INSTALL FAN AND GENERATOR V BELT
Refer to PROCEDURE - Step 1 [10/2014 - ]
- INSPECT REAR ENGINE UNDER COVER RH
Refer to PROCEDURE - Step 2 [10/2014 - ]
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [10/2014 - 09/2017] , or refer to INITIALIZATION [09/2017 - 05/2019]