Installation [10/2017 - 09/2020]: Procedure
WARNING: This page does not describe the selected car, but rather 20 other vehicles, including the 2024 Lexus IS 350, 2024 Lexus IS 300, 2023 Lexus IS 350, 2023 Lexus IS 300, and 2022 Lexus IS 350. However, it is still accessible from the selected car via links, so may be relevant.
- INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY
- Temporarily install the transmission floor shift assembly to the body with the 4 bolts.NOTE:
Do not pinch the wire harness.
- Fully tighten the 4 bolts in the order shown in the illustration.
Torque: 8.3 N*m (85 kgf*cm, 73 in.*lbf)
- Connect the shift lock control ECU connector.NOTE:
Be sure to securely connect the shift lock control ECU connector.
- Connect the 4 clamps to the transmission floor shift assembly.
- Connect the transmission control switch connector.NOTE:
Be sure to securely connect the transmission control switch connector.
- Temporarily install the transmission floor shift assembly to the body with the 4 bolts.
- INSTALL NO. 1 CONSOLE BOX DUCT
- Install the No. 1 console box duct with the 2 clips.
- Connect the 2 clamps to the No. 1 console box duct.
- INSTALL CONSOLE BOX ASSEMBLY
Refer to INSTALLATION [10/2016 - 09/2020]
- INSTALL FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY
- Turn the transmission control shaft lever RH counterclockwise until it stops, then turn it clockwise 2 notches.
*1 Transmission Control Shaft Lever RH *a P *b R *c N - Move the shift lever to N.
- Temporarily install the floor shift gear shifting rod sub-assembly to the lever of the transmission floor shift assembly with the nut.
*a Lever Pushing the lever rearward - Tighten the nut while lightly pushing the lever of the transmission floor shift assembly rearward.
Torque: 12.8 N*m (131 kgf*cm, 9 ft.*lbf)
NOTE:Do not push the lever of the transmission floor shift assembly too hard.
- Turn the transmission control shaft lever RH counterclockwise until it stops, then turn it clockwise 2 notches.
- INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR
Refer to PROCEDURE - Step 5
- INSTALL FRONT EXHAUST PIPE ASSEMBLY (for 2GR-FKS)
Refer to INSTALLATION [10/2017 - 09/2020]
- INSTALL FRONT EXHAUST PIPE ASSEMBLY (for 8AR-FTS)
Refer to INSTALLATION [10/2016 - 09/2020]
- INSPECT SHIFT LEVER POSITION
See step 1
- INSPECT FOR EXHAUST GAS LEAK (for 2GR-FKS)
Refer to PROCEDURE - Step 9
- INSPECT FOR EXHAUST GAS LEAK (for 8AR-FTS)
Refer to PROCEDURE - Step 8