Removal [04/2013 - 08/2015]: Procedure
- REMOVE COOL AIR INTAKE DUCT SEAL
Refer to PROCEDURE - Step 1
- REMOVE V-BANK COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 3
- REMOVE INLET NO. 1 AIR CLEANER
Refer to PROCEDURE - Step 20
- REMOVE CENTER NO. 4 ENGINE UNDER COVER
Refer to PROCEDURE - Step 2
- DRAIN ENGINE COOLANT
See step 4
- DISCONNECT NO. 2 RADIATOR HOSE
- DISCONNECT NO. 6 WATER BY-PASS HOSE
- REMOVE WATER INLET WITH THERMOSTAT SUB-ASSEMBLY