LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2015 >> IS 250 Base, RWD >> Repair and Diagnosis >> Engine Mechanical >> Auxiliary Emission Control Systems >> Emission Control System (4GR-FSE) - Service Information >> PCV Valve >> Installation [04/2013 - 08/2015] >> Procedure

Installation [04/2013 - 08/2015]: Procedure

  1. INSTALL PCV VALVE (VENTILATION VALVE SUB-ASSEMBLY) 
    1. Apply adhesive to 2 or 3 threads of the PCV valve (ventilation valve sub-assembly).

      Adhesive

      Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent

    2. Using a 19 mm deep socket wrench, install the PCV valve (ventilation valve sub-assembly) to the cylinder head cover sub-assembly LH.

      Torque: 27 N.m (275 kgf/cm, 20 ft.lbf) 

      NOTE:

      Do not start the engine for at least 1 hour after installation.

    3. Connect the ventilation hose assembly to the PCV valve (ventilation valve sub-assembly) and slide the clip to secure it.
  2. INSTALL V-BANK COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 104