LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2015 >> CT 200h Base >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Meter / Gauge / Display - Service Information >> Combination Meter >> Installation [08/2014 - ] >> Procedure

Installation [08/2014 - ]: Procedure

  1. INSTALL COMBINATION METER ASSEMBLY 
    1. Connect the connector.
    2. Engage the 2 clips.
    3. Install the combination meter assembly with the 2 screws.
    4. Engage the clamp.
  2. INSTALL METER HOOD SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 32

  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
    NOTE:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See article. Refer to INITIALIZATION [08/2014 - 08/2015] Refer to INITIALIZATION [08/2015 - ] ).

  4. INSTALL REAR FLOOR BOARD UPPER NO. 3 PLATE 

    Refer to PROCEDURE - Step 69

  5. INSTALL DECK FLOOR BOX RH 

    Refer to PROCEDURE - Step 70

  6. INSTALL REAR NO. 3 FLOOR BOARD 

    Refer to PROCEDURE - Step 71

  7. INSTALL REAR DECK FLOOR BOX 

    Refer to PROCEDURE - Step 72

  8. INSTALL REAR NO. 2 FLOOR BOARD 

    Refer to PROCEDURE - Step 73