Installation [10/2017 - 09/2020]: Procedure
WARNING: This page is about a different variant/trim than selected.
- INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY
- Temporarily install the transmission floor shift assembly to the body with the 4 bolts.NOTE:
Do not pinch the wire harness.
- Fully tighten the 4 bolts in the order shown in the illustration.
Torque: 8.3 N*m (85 kgf*cm, 73 in.*lbf)
- Connect the shift lock control ECU connector.NOTE:
Be sure to securely connect the shift lock control ECU connector.
- Connect the 4 clamps to the transmission floor shift assembly.
- Connect the transmission control switch connector.NOTE:
Be sure to securely connect the transmission control switch connector.
- Temporarily install the transmission floor shift assembly to the body with the 4 bolts.
- INSTALL NO. 1 CONSOLE BOX DUCT
- Install the No. 1 console box duct with the 2 clips.
- Connect the 2 clamps to the No. 1 console box duct.
- INSTALL CONSOLE BOX ASSEMBLY
Refer to INSTALLATION [10/2016 - 09/2020]
- INSTALL FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY
- Turn the transmission control shaft lever RH counterclockwise until it stops, then turn it clockwise 2 notches.
*1 Transmission Control Shaft Lever RH *a P *b R *c N - Move the shift lever to N.
- Temporarily install the floor shift gear shifting rod sub-assembly to the lever of the transmission floor shift assembly with the nut.
*a Lever Pushing the lever rearward - Tighten the nut while lightly pushing the lever of the transmission floor shift assembly rearward.
Torque: 12.8 N*m (131 kgf*cm, 9 ft.*lbf)
NOTE:Do not push the lever of the transmission floor shift assembly too hard.
- Turn the transmission control shaft lever RH counterclockwise until it stops, then turn it clockwise 2 notches.
- INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR
Refer to PROCEDURE - Step 5
- INSTALL FRONT EXHAUST PIPE ASSEMBLY (for 2GR-FKS)
Refer to INSTALLATION [10/2017 - 09/2020]
- INSTALL FRONT EXHAUST PIPE ASSEMBLY (for 8AR-FTS)
Refer to INSTALLATION [10/2016 - 09/2020]
- INSPECT SHIFT LEVER POSITION
See step 1
- INSPECT FOR EXHAUST GAS LEAK (for 2GR-FKS)
Refer to PROCEDURE - Step 9
- INSPECT FOR EXHAUST GAS LEAK (for 8AR-FTS)
Refer to PROCEDURE - Step 8