Installation [04/2013 - 08/2015]: Procedure
WARNING: This page is about a different car, the 2015 Lexus IS 250 and 2014 Lexus IS 250. However, it is still accessible from the selected car via links, so may be relevant.
- INSTALL WATER INLET WITH THERMOSTAT SUB-ASSEMBLY
- Install a new gasket and the water inlet with thermostat sub-assembly with the 3 nuts.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- Install a new gasket and the water inlet with thermostat sub-assembly with the 3 nuts.
- CONNECT NO. 6 WATER BY-PASS HOSE
- Connect the No. 6 water by-pass hose to the water inlet and slide the clip to secure it.
- CONNECT NO. 2 RADIATOR HOSE
- Connect the No. 2 radiator hose to the water inlet with thermostat sub-assembly and slide the clip to secure it.
- INSTALL INLET NO. 1 AIR CLEANER
Refer to PROCEDURE - Step 74
- ADD ENGINE COOLANT
See step 5
- INSPECT FOR COOLANT LEAK
Refer to PROCEDURE - Step 1
- INSTALL CENTER NO. 4 ENGINE UNDER COVER
Refer to PROCEDURE - Step 9
- INSTALL V-BANK COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 104
- INSTALL COOL AIR INTAKE DUCT SEAL
Refer to PROCEDURE - Step 3