Installation [08/2015 - ]: Procedure
- INSTALL GENERATOR ASSEMBLY
- Install the 2 wire harness clamp brackets to the generator assembly with the 3 bolts.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- Install the generator assembly with the 2 bolts.
Torque: 43 N.m (438 kgf/cm, 32 ft.lbf)
- Engage the 4 wire harness clamps.
- Connect the generator assembly connector.
- Connect the wire harness to terminal B with the nut.
Torque: 12 N.m (122 kgf/cm, 106 in.lbf)
- Install the terminal cap.
- Engage the 2 wire harness clamps.
- Install the 2 wire harness clamp brackets to the generator assembly with the 3 bolts.
- INSTALL V-RIBBED BELT
Refer to INSTALLATION [08/2015 - ]
- INSTALL AIR CLEANER ASSEMBLY WITH NO. 2 AIR CLEANER HOSE
Refer to PROCEDURE - Step 49 [08/2015 - 10/2016] , or refer to PROCEDURE - Step 49 [10/2016 - 09/2020] , or refer to PROCEDURE - Step 49 [09/2020 - ]
- INSTALL INLET NO. 1 AIR CLEANER
Refer to PROCEDURE - Step 80 [08/2015 - 10/2016] , or refer to PROCEDURE - Step 79 [10/2016 - 09/2020] , or refer to PROCEDURE - Step 79 [09/2020 - ]
- INSTALL COOL AIR INTAKE DUCT SEAL
Refer to PROCEDURE - Step 3 [04/2013 - 10/2016] , or refer to PROCEDURE - Step 2 [10/2016 - 09/2020] , or refer to PROCEDURE - Step 2 [09/2020 - ]
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [08/2015 - 10/2016] , or refer to INITIALIZATION [10/2016 - 10/2017] , or refer to INITIALIZATION [10/2017 - 09/2020] , or refer to INITIALIZATION [09/2020 - 11/2021] , or refer to INITIALIZATION [11/2021 - 09/2022] , or refer to INITIALIZATION [09/2022 - 10/2023] , or refer to INITIALIZATION [10/2023 - ]