LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2014 >> IS 350 Base, AWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 23 (Engine Cooling System (8AR-FTS) - Service Information) >> THERMOSTAT (for Cylinder Block) >> Installation [08/2015 - ] >> Procedure

Installation [08/2015 - ]: Procedure

WARNING: This page does not describe the selected car, but rather 9 other vehicles, including the 2024 Lexus IS 300, 2023 Lexus IS 300, 2022 Lexus IS 300, 2021 Lexus IS 300, and 2020 Lexus IS 300. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL THERMOSTAT (for Cylinder Block) 
    1. Install a new gasket to the thermostat (for Cylinder Block).
    2. Install the thermostat (for Cylinder Block) to the cylinder block sub-assembly as shown in the illustration.
      GTY521499Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL WATER INLET HOUSING 
    1. Install 3 new gaskets to the water inlet housing.
    2. Install the water inlet housing to the cylinder block sub-assembly with the 4 bolts and nut.

      Torque: 21 N.m (214 kgf/cm, 15 ft.lbf) 

  3. INSTALL NO. 4 WATER BY-PASS PIPE 
    1. Install a new gasket to the water inlet housing.
    2. Connect the No. 4 water by-pass pipe to the water inlet housing with the 2 nuts.

      Torque: 10 N.m (102 kgf/cm, 7 ft.lbf) 

    3. Connect the No. 4 water by-pass pipe to the cylinder block sub-assembly with the bolt.

      Torque: 10 N.m (102 kgf/cm, 7 ft.lbf) 

    4. Connect the No. 4 water by-pass hose to the No. 4 water by-pass pipe and slide the clip to secure it.
  4. INSTALL WATER BY-PASS PIPE ASSEMBLY 
    1. Install a new gasket to the water inlet housing.
    2. Connect the water by-pass pipe assembly to the water inlet housing with the 2 nuts.

      Torque: 10 N.m (102 kgf/cm, 7 ft.lbf) 

    3. Engage the 3 clamps to connect the wire harness to the water inlet.
    4. Connect the oil pressure switching valve assembly connector.
    5. Connect the water by-pass pipe assembly to the cylinder block sub-assembly with the 2 bolts.

      Torque: 10 N.m (102 kgf/cm, 7 ft.lbf) 

    6. Connect the No. 5 water by-pass hose to the water by-pass pipe assembly and slide the clip to secure it.
  5. INSTALL NO. 3 EXHAUST MANIFOLD HEAT INSULATOR 
    1. Install the No. 3 exhaust manifold heat insulator with the 2 bolts.

      Torque: 10 N.m (102 kgf/cm, 7 ft.lbf) 

  6. INSTALL NO. 1 COMPRESSOR MOUNTING BRACKET 
    1. Install the No. 1 compressor mounting bracket with the 4 bolts.

      Torque: 21 N.m (214 kgf/cm, 15 ft.lbf) 

  7. INSTALL COMPRESSOR ASSEMBLY WITH PULLEY 

    Refer to INSTALLATION [08/2015 - 10/2017] , or refer to INSTALLATION [10/2017 - 09/2020] , or refer to INSTALLATION [09/2020 - 11/2021] , or refer to INSTALLATION [11/2021 - 09/2022] , or refer to INSTALLATION [09/2022 - ]

  8. INSTALL TURBOCHARGER SUB-ASSEMBLY 

    Refer to INSTALLATION [08/2015 - ]