LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2014 >> IS 350 Base, AWD >> Repair and Diagnosis >> Engine Mechanical >> Lubrication System >> Engine Lubrication System (2GR-FSE) - Service Information >> Oil Pressure Switch >> Installation [04/2013 - 10/2017] >> Procedure

Installation [04/2013 - 10/2017]: Procedure

  1. INSTALL ENGINE OIL PRESSURE SWITCH ASSEMBLY 
    1. Apply adhesive to 2 or 3 threads of the engine oil pressure switch assembly.

      Adhesive

      Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent

      NOTE:
      • Do not apply adhesive to the oil inlet port of the engine oil pressure switch assembly.
      • Install the engine oil pressure switch assembly within 3 minutes after applying adhesive.
      GTY445402Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *1 Adhesive 1324
    2. Using a 24 mm deep socket wrench, install the engine oil pressure switch assembly.

      Type A 

      Torque: 14.7 N*m (150 kgf*cm, 11 ft.*lbf) 

      Type B 

      Torque: 15 N*m (153 kgf*cm, 11 ft.*lbf) 

      NOTE:

      Do not start the engine within 1 hour of installation.

      GTY463877Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Type A
      *b Type B
    3. Connect the engine oil pressure switch assembly connector.
  2. ADD ENGINE OIL 

    See step  7[04/2013 - 08/2015], or see step  7[08/2015 - 10/2017]

  3. INSPECT ENGINE OIL LEVEL 

    Refer to PROCEDURE - Step 1

  4. INSPECT FOR OIL LEAK 

    See step  8 [04/2013 - 08/2015], or see step  8[08/2015 - 10/2017]

  5. INSTALL NO. 1 AIR CLEANER INLET 

    Refer to PROCEDURE - Step 75 [04/2013 - 08/2015] , or refer to PROCEDURE - Step 76 [08/2015 - 10/2016] , or refer to PROCEDURE - Step 77 [10/2016 - 10/2017]

  6. INSTALL COOL AIR INTAKE DUCT SEAL 

    Refer to PROCEDURE - Step 3 [04/2013 - 10/2016] , or refer to PROCEDURE - Step 2 [10/2016 - 09/2020]