Installation [04/2013 - 10/2017]: Procedure
- INSTALL WATER INLET WITH THERMOSTAT SUB-ASSEMBLY
- Install a new gasket and the water inlet with thermostat sub-assembly with the 3 nuts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Install a new gasket and the water inlet with thermostat sub-assembly with the 3 nuts.
- CONNECT NO. 6 WATER BY-PASS HOSE
- Connect the No. 6 water by-pass hose to the water inlet and slide the clip to secure it.
- CONNECT NO. 2 RADIATOR HOSE
- Connect the No. 2 radiator hose to the water inlet with thermostat sub-assembly and slide the clip to secure it.
- INSTALL INLET NO. 1 AIR CLEANER
Refer to PROCEDURE - Step 75 [04/2013 - 08/2015] , or refer to PROCEDURE - Step 76 [08/2015 - 10/2016] , or refer to PROCEDURE - Step 77 [10/2016 - 10/2017]
- ADD ENGINE COOLANT
See step 5[04/2013 - 08/2015], or see step 5[08/2015 - 10/2017]
- INSPECT FOR COOLANT LEAK
Refer to PROCEDURE - Step 1
- INSTALL CENTER NO. 4 ENGINE UNDER COVER
Refer to PROCEDURE - Step 9 [04/2013 - 08/2015] , or refer to PROCEDURE - Step 9 [08/2015 - 10/2017]
- INSTALL V-BANK COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 105 [04/2013 - 08/2015] , or refer to PROCEDURE - Step 106 [08/2015 - 10/2016] , or refer to PROCEDURE - Step 106 [10/2016 - 10/2017]
- INSTALL COOL AIR INTAKE DUCT SEAL
Refer to PROCEDURE - Step 3 [04/2013 - 10/2016] , or refer to PROCEDURE - Step 2 [10/2016 - 09/2020]