Installation [04/2013 - 10/2017]: Procedure
- INSTALL PCV VALVE (VENTILATION VALVE SUB-ASSEMBLY)
- Apply adhesive to 2 or 3 threads of the PCV valve (ventilation valve sub-assembly).
Adhesive
Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent
- Using a 19 mm deep socket wrench, install the PCV valve (ventilation valve sub-assembly) to the cylinder head cover sub-assembly LH.
Torque: 27 N*m (275 kgf*cm, 20 ft.*lbf)
NOTE:Do not start the engine for at least 1 hour after installation.
- Connect the ventilation hose assembly to the PCV valve (ventilation valve sub-assembly) and slide the clip to secure it.
- Apply adhesive to 2 or 3 threads of the PCV valve (ventilation valve sub-assembly).
- INSTALL V-BANK COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 105 [04/2013 - 08/2015] , or refer to PROCEDURE - Step 106 [08/2015 - 10/2016] , or refer to PROCEDURE - Step 106 [10/2016 - 10/2017]