LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2014 >> IS 350 Base, AWD >> Repair and Diagnosis >> Engine Mechanical >> Auxiliary Emission Control Systems >> Emission Control System (2GR-FSE) - Service Information >> PCV Valve >> Installation [04/2013 - 10/2017] >> Procedure

Installation [04/2013 - 10/2017]: Procedure

  1. INSTALL PCV VALVE (VENTILATION VALVE SUB-ASSEMBLY) 
    1. Apply adhesive to 2 or 3 threads of the PCV valve (ventilation valve sub-assembly).

      Adhesive

      Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent

    2. Using a 19 mm deep socket wrench, install the PCV valve (ventilation valve sub-assembly) to the cylinder head cover sub-assembly LH.

      Torque: 27 N*m (275 kgf*cm, 20 ft.*lbf) 

      NOTE:

      Do not start the engine for at least 1 hour after installation.

    3. Connect the ventilation hose assembly to the PCV valve (ventilation valve sub-assembly) and slide the clip to secure it.
  2. INSTALL V-BANK COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 105 [04/2013 - 08/2015] , or refer to PROCEDURE - Step 106 [08/2015 - 10/2016] , or refer to PROCEDURE - Step 106 [10/2016 - 10/2017]