LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2014 >> IS 350 Base, AWD >> Repair and Diagnosis (Single Page) >> Accessories & Equipment >> Gauges & Instrument Panels >> Meter / Gauge / Display - Service Information >> Combination Meter >> Installation [09/2020 - ] >> Procedure

Installation [09/2020 - ]: Procedure

  1. INSTALL COMBINATION METER ASSEMBLY 
    1. Connect each connector.
    2. Engage the clamp.
    3. Install the combination meter assembly with the 4 screws.
  2. INSTALL METER HOOD SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 30

  3. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 33

  4. CONNECT HOOD LOCK CONTROL LEVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 34

  5. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 35

  6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
    NOTE:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Refer to INITIALIZATION [09/2020 - 11/2021] , or refer to INITIALIZATION [11/2021 - 09/2022] , or refer to INITIALIZATION [09/2022 - 10/2023] , or refer to INITIALIZATION [10/2023 - ]

  7. CUSTOMIZE POWER TILT AND POWER TELESCOPIC STEERING COLUMN SYSTEM (for Power Tilt and Power Telescopic Steering Column) 

    Refer to PROCEDURE - Step 16 [09/2020 - 11/2021] , or refer to PROCEDURE - Step 17 [11/2021 - ]