Installation
1UR-FE EMISSION CONTROL: PURGE VALVE: INSTALLATION
1. INSTALL PURGE VSV
(a) Install the purge VSV with the bolt.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
Text in Illustration
(b) Connect the 2 purge line hoses.
HINT
Make sure the direction of the hose clamp is as shown in the illustration.
(c) Connect the purge VSV connector.
2. INSTALL V-BANK COVER SUB-ASSEMBLY Installation