LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2011 >> GX 460 V8-4.6L (1UR-FE) >> Repair and Diagnosis >> Powertrain Management >> Emission Control Systems >> Air Injection >> Air Injection Control Valve >> Service and Repair >> Air Switching Valve (for Bank 2) >> Removal

Removal





1UR-FE EMISSION CONTROL: AIR SWITCHING VALVE (for Bank 2): REMOVAL

1. REMOVE ENGINE ROOM SIDE COVER Removal

2. REMOVE V-BANK COVER SUB-ASSEMBLY Removal

3. REMOVE AIR CLEANER CAP AND HOSE Removal

4. DISCONNECT NO. 3 VENTILATION HOSE





5. DISCONNECT NO. 1 AIR INJECTION SYSTEM HOSE





6. REMOVE AIR SWITCHING VALVE ASSEMBLY





Detach the wire harness clamp and disconnect the air switching valve connector.

(a) Remove the bolt and disconnect the wire harness clamp bracket.





Remove the 2 bolts.





Remove the 3 bolts, air switching valve and gasket.

NOTICE:
Be careful not to damage the surfaces that contact the gasket.