Installation
1UR-FE EMISSION CONTROL: AIR SWITCHING VALVE (for Bank 1): INSTALLATION
1. INSTALL AIR SWITCHING VALVE ASSEMBLY
(a) Install a new gasket and the air switching valve with the 3 bolts.
Torque : 24 Nm (245 kgf-cm, 18 ft-lbf)
Text in Illustration
NOTICE:
Make sure the claws of the gasket are not caught between the air switching valve and No. 4 air tube.
(b) Install the 2 bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(c) Connect the wire harness clamp bracket with the bolt.
Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)
2. CONNECT NO. 2 AIR INJECTION SYSTEM HOSE
(a) Align the paint mark with the projection and connect the No. 2 air injection system hose.
Text in Illustration
HINT
Make sure the direction of the hose clamp is as shown in the illustration.
(b) Connect the air switching valve connector.
3. INSTALL ENGINE ROOM SIDE COVER LH Installation
4. INSTALL V-BANK COVER SUB-ASSEMBLY Installation