INSTALLATION (To 8/2009): Installation
- INSTALL LIGHT CONTROL RHEOSTAT
- Install the light control rheostat with the 2 screws.
- INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY . Refer to INSTALLATION - Step 36
- INSTALL NO. 1 SWITCH HOLE BASE . Refer to INSTALLATION - Step 37
- INSTALL INSTRUMENT PANEL GARNISH LH . Refer to INSTALLATION - Step 38
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL (w/ Air Suspension) NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected. Refer to INITIALIZATION .
- INSPECT SUSPENSION CONTROL SYSTEM (w/ Air Suspension)
- Inspect the suspension control system. Refer to TEST MODE PROCEDURE .